Fastening the MVS
WARNING!
Do not fasten the MVS by electric welding, because the welding circuit can damage
electronic circuits and integrity of the station. ABB does not assume any liability
for damages caused by electric welding.
To fasten the MVS to the foundation, bolt the cabinet through the holes on the base of the
inverter or use the supplied attachment brackets (see figure below). Use bolts and washers
in each connection point.
Placement of bracket
Attachment bracket
Fastening points
Follow the local regulations and applicable standard to calculate the mechanical connections
and structural properties. Always consider the site conditions and terrain characteristics.
For more information, see drawing 3AES-PVS-175-MVS-30-DW02.
Constructing earthing electrode and earthing
Construct an earthing electrode for the MVS according to the local regulations. For more
information, see drawing 3AES-PVS-175-MVS-02-DW02.
Mechanical installation 35
Содержание PVS-175 Series
Страница 1: ... ABB SOLAR INVERTERS PVS 175 medium voltage station Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 14: ...14 ...
Страница 26: ...26 ...
Страница 32: ...32 ...
Страница 40: ...6 Apply a layer of sealant around the hood border 40 Mechanical installation ...
Страница 48: ...48 ...
Страница 54: ...54 ...
Страница 60: ...Replacing component 1 Loosen and remove the external screws of the ventilation grille 60 Maintenance ...
Страница 68: ...68 ...
Страница 70: ......