![ABB PowerValue 11/31 T Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/abb/powervalue-11-31-t/powervalue-11-31-t_operating-manual_2041022.webp)
Modifications reserved
Page 21/49
Dual Input Feed
1.
Connect the neutral cable to the neutral terminal (mains 1 and mains 2).
2.
Connect the 3 pin connector provided with the UPS between terminals L1, L2 and L3.
Figure 9: 3 pin connector installation
3.
Connect the phase cables accordingly.
Figure 10: Dual feed (11) wiring diagram
Terminal block cover
3 PIN for connecting
L1,L2,L3
Содержание PowerValue 11/31 T
Страница 3: ......