4.2
Electrical Installation
4.2.1
Commissioning
The UPS must be commissioned by a fully trained and authorized field service engineer before being
put into use. The commissioning of the UPS involves the connection of the UPS and batteries, the
verification of the electrical installation and operating environment of the UPS, the controlled start-up
and testing of the UPS and customer training.
CAUTION!
TO ENSURE CORRECT OPERATION OF THE UPS AND BATTERIES, IT IS
NECESSARY TO PROVIDE THE MAINS CABLES WITH APPROPRIATE FUSE
PROTECTION
4.2.2
Connections
Before installing the electrical wiring, check the nominal amperage of your incoming feeder.
DANGER!
WARNING!
THE CABLING CONNECTIONS MUST BE CARRIED OUT BY QUALIFIED
ELECTRICAL PERSONNEL
CAUTION!
DO NOT USE THE WALL SOCKET AS THE INPUT POWER SOURCE FOR
THE UPS. ITS RATED CURRENT IS NOT ADEQUATE TO THE FEED THE UPS
AND MAY BURN THE SOCKET
The UPS is cabled through the terminal blocks as indicated in
Figure 6: Terminal blocks