9 Periodical checks
The following is a list of recommended checks and maintenance operations that should be periodically carried-out by
qualified personnel.
Check that:
The AOPD remains in OSSD OFF state (
) during beam interruption along the entire detection zone,
using the
suitable “Test Piece” and following the Figure 17 scheme (paragraph 3.3).
The AOPD is correctly aligned: press slightly the product side, in both directions, and check that the red LED
does not turn on.
The stopping time of the machine, including the response times of the AOPD and of the machine, is within the
limits defined for the calculation of the minimum installation distance (see paragraph 2.4
– “Minimum
”).
The minimum installation distance between the hazard zone and the AOPD is in accordance with the
instructions included in paragraph 2.4
– “Minimum installation distance”.
Access of a person between the AOPD and the hazard zone of the machine is not possible, nor is it possible
for him/her to stay there without being detected.
Access to the hazard zone of the machine from any unprotected area is not possible.
The AOPD and the external electrical connections are not damaged.
The frequency of the checks depends on the particular application and on the operating conditions of the AOPD.
Содержание Orion 3 Base
Страница 24: ...2TLC172289M0201 Rev C 24 www abb com jokabsafety 2018 04 17 Figure 20 Connection to a Pluto B20 safety PLC ...
Страница 26: ...2TLC172289M0201 Rev C 26 www abb com jokabsafety 2018 04 17 Figure 23 Time chart of the OSSD outputs ...
Страница 42: ...2TLC172289M0201 Rev C 42 www abb com jokabsafety 2018 04 17 14 EC Declaration of conformity ...