![ABB Orion 3 Base Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/abb/orion-3-base/orion-3-base_original-instructions-manual_5140020.webp)
2TLC172289M0201
Rev C
20
www.abb.com/jokabsafety
2018-04-17
4 Mechanical mounting
The active and passive units must be installed with the relevant sensitive surfaces facing each other. The distance
between the two units must be within the operating range of the model used (see paragraph 11
– “Technical data”).
The two units must be aligned and as parallel as possible. The next step is the fine alignment, as shown in paragraph
6
4.1 Mounting with angled fixing brackets
Angled fixing brackets are supplied with all Orion3 Base models. To mount the AOPD, insert the supplied
“double nut
plate” (M5) into the grooves on the two units (see Figure 18).
Figure 18
– Mounting with angled fixing brackets
.
Содержание Orion 3 Base
Страница 24: ...2TLC172289M0201 Rev C 24 www abb com jokabsafety 2018 04 17 Figure 20 Connection to a Pluto B20 safety PLC ...
Страница 26: ...2TLC172289M0201 Rev C 26 www abb com jokabsafety 2018 04 17 Figure 23 Time chart of the OSSD outputs ...
Страница 42: ...2TLC172289M0201 Rev C 42 www abb com jokabsafety 2018 04 17 14 EC Declaration of conformity ...