
Note
Action
Roundsling, 1 m (2 pcs) Lifting ca-
pacity: 1,000 kg.
xx1700000087
Fasten the lifting slings.
3
!
3HAC059516-001 (2)
xx1600002060
Raise the lifting slings to take the weight of the
balancing device.
CAUTION
The balancing device is heavy at the back, and
will tip over when the link ear is loosened.
xx1700000322
4
Removing the shaft in the front (link ear)
Note
Action
It is possible to drive a screwdriver
(or similar) through the VK cover,
as close as possible to the center
of the VK cover and pull it out.
xx1700000088
Remove the VK cover at the link ear.
Note
Make sure that the lifting accessories hold the
weight of the balancing device.
Tip
Use high pressure air to remove the VK covers.
1
Continues on next page
612
Product manual - IRB 6700Inv
3HAC058254-001 Revision: L
© Copyright 2017 - 2020 ABB. All rights reserved.
4 Repair
4.8.3 Replacing the axis-2 gearbox
Continued
Содержание IRB 6700Inv
Страница 1: ...ROBOTICS Product manual IRB 6700Inv ...
Страница 2: ...Trace back information Workspace 20D version a8 Checked in 2020 12 11 Skribenta version 5 3 075 ...
Страница 16: ...This page is intentionally left blank ...
Страница 40: ...This page is intentionally left blank ...
Страница 182: ...This page is intentionally left blank ...
Страница 672: ...This page is intentionally left blank ...
Страница 704: ...This page is intentionally left blank ...
Страница 720: ...This page is intentionally left blank ...
Страница 722: ...This page is intentionally left blank ...
Страница 729: ......