Note
Action
See the figure in
Put the battery unit into its recess while arranging
the SMB cables as shown in the figure.
4
See the figure in
Secure the
SMB cover
with its
attachment screws
.
5
Detailed in
Update the revolution counter.
6
DANGER
Make sure all safety requirements are met when
performing the first test run. These are further de-
tailed in the section
cause injury or damage! on page 50
7
186
3HAC033453-001 Revision: H
© Copyright 2009-2013 ABB. All rights reserved.
3 Maintenance
3.4.8 Replacing SMB battery
Continued
Содержание IRB 4600 - 20/2.50
Страница 1: ...ABB Robotics Product manual IRB 4600 ...
Страница 2: ...Trace back information Workspace R13 2 version a3 Checked in 2013 10 15 Skribenta version 4 0 378 ...
Страница 8: ...371 Index 8 3HAC033453 001 Revision H Copyright 2009 2013 ABB All rights reserved Table of contents ...
Страница 108: ...This page is intentionally left blank ...
Страница 318: ...This page is intentionally left blank ...
Страница 332: ...This page is intentionally left blank ...
Страница 373: ......