4.3.2 Replacement of serial measurement board
General
This section describes how to replace the SMB unit (serial measurement board).
DANGER
Turn off all electrical power, hydraulic and pneumatic pressure supplies before
entering the workspace of the manipulator.
Also read the safety sections:
•
Pneumatic or hydraulic related hazards on page 32
•
•
Maintenance and repair on page 34
Continues on next page
Product manual - IRB 360
163
3HAC030005-001 Revision: Z
© Copyright 2008-2021 ABB. All rights reserved.
4 Repair
4.3.2 Replacement of serial measurement board
Содержание IRB 360
Страница 1: ...ROBOTICS Product manual IRB 360 ...
Страница 8: ...This page is intentionally left blank ...
Страница 266: ...This page is intentionally left blank ...
Страница 268: ...This page is intentionally left blank ...
Страница 271: ......