![ABB IRB 360 Скачать руководство пользователя страница 134](http://html.mh-extra.com/html/abb/irb-360/irb-360_product-manual_5042134.webp)
Note
Action
xx0800000024
Refit the transmission
cover using the 6pcs
M6 x 20 hexagon bolt
with flange.
Use locking liquid (loc-
tite 243).
Note
Follow the tightening
sequence in the figure.
16
Tightening torque 4 Nm
.
B
A
xx1100000540
After tightening, check
that the sealing com-
pound fills the entire
gap according to figure,
position B. Remove ex-
cessive compound or
fill up if needed.
17
Continues on next page
134
Product manual - IRB 360
3HAC030005-001 Revision: Z
© Copyright 2008-2021 ABB. All rights reserved.
3 Maintenance
3.5.2 Gearboxes, axes 1- 4
Continued
Содержание IRB 360
Страница 1: ...ROBOTICS Product manual IRB 360 ...
Страница 8: ...This page is intentionally left blank ...
Страница 266: ...This page is intentionally left blank ...
Страница 268: ...This page is intentionally left blank ...
Страница 271: ......