![ABB HT564933 Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/abb/ht564933/ht564933_operation-manual_3345746098.webp)
Operation Manual / TPL65VA32/33
Disassembly and assembly
8
Installing cartridge group
8.9
Page 96
© Copyright 2015 ABB. All rights reserved.
Sept
em
ber
2015
H
ZT
L2464_
EN
R
ev
is
ion
C
Attach lifting gear to lifting device (90190) and turn compressor casing
(72000).
By hand, screw three press-off nuts (61090) onto bearing casing
studs, equally spaced around circumference and up to end of thread.
Push compressor casing (72000) onto cartridge group to fit snugly and
fasten it using nuts (61037).
Secure three press-off nuts (61090) against compressor casing
(72000) by tightening them to specified torque. (See chapter Table of
tightening torques.)
Remove lifting device (90190).
Fit sealing air line (56501) between compressor casing (72000) and
variable turbine geometry module (56100).