![ABB HT564933 Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/abb/ht564933/ht564933_operation-manual_3345746066.webp)
Operation Manual / TPL65VA32/33
Maintenance
5
Cleaning the compressor during
operation
5.3
Page 64
© Copyright 2015 ABB. All rights reserved.
Sept
em
ber
2015
H
ZT
L2464_
EN
R
ev
is
ion
C
Screw in the sealing plug (X).
Push the valve activator (Y) against the spring and hold it for
10 ... 15 seconds until the entire volume of water has been injected.
After cleaning, wait at least 5 minutes to allow the turbocharger to dry.
NOTICE
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning results are still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an official ABB
Turbocharging Service Station.
Cleaning parameters per turbocharger compressor
Product
Engine load
Contents of water vessel
[dm
3
]
TPL65
50 … 85%
0.4