6.2.2
Install the cabinet on the foundation
Preliminary requirements
•
Hoisting equipment or
forklift truck
•
Torque wrench
•
Four fasteners M16 and
washers
Procedure
1. Carefully lower the cabinet on the
foundation with a hoisting equipment
or a forklift truck. Refer to section
Caution: Make sure that
there is no kink in the
cables.
2. Make sure that the holes in the cabinet
(A) and the foundation (B) are aligned.
3. Install the fasteners (C) and the
washers.
4. Tighten the fasteners to the correct
torque. For the specification, refer to
section
6.2.3
Open the cable inlets
Preliminary requirements
•
Open spanner
Procedure
1. Open the door. Refer to section
.
2. Loosen the fasteners (A).
3. Move the sliding plates (B) to open the
cable inlets.
A
C
B
B A
Installation
38
9AKK107992A6488-EN | 004
Содержание HP CP500
Страница 103: ...Technical data 9AKK107992A6488 EN 004 103 ...
Страница 104: ......