7 Installation and Interconnections, Flowmeter Primaries and Converters
78
FCM2000
D184B111U02
7.5
Assembly of the Signal Cable
Cable Specifications
The signal cable between the flowmeter primary and the converter has the following specifications:
•
Designation: UNITRONIC - LI2YCY (TP)
•
6 x 2 x 0.22 mm²
•
Two outer shields
•
Temperature range:
−
30 °C to +70 °C
•
Loop resistance: max. 186
Ω
/km
•
Inductance: ca. 0.65 mH/km
•
Max. cable length: 50m
1. Remove the signal cable insulation for approx. 80 mm (remove 50 mm at the flowmeter primary side).
2. Cut the woven shield to a length of approx. 15 mm
3. Remove cable drain wire and foil shield.
4. Remove cable insulation and attach cable conductor sleeves.
5. Wind shield core around woven shield.
Fig. 33:
Insulating the Signal Cable
Fig. 34:
Positioning the Shield Drain Wire
Cable drain wire
Foil shield
Shield core
Woven shield
Remove foil
Содержание CoriolisMaster FCM2000
Страница 6: ...Contents 6 FCM2000 D184B111U02...
Страница 90: ...11 Certificates 90 FCM2000 D184B111U02 11 Certificates 11 1 EU Certificate of Compliance Fig 42...
Страница 91: ...11 Certificates D184B111U02 FCM2000 91 Fig 43...
Страница 92: ...11 Certificates 92 FCM2000 D184B111U02 11 2 EU Type Examination Certificate Fig 44...
Страница 93: ...11 Certificates D184B111U02 FCM2000 93 Fig 45...
Страница 94: ...11 Certificates 94 FCM2000 D184B111U02 Fig 46...
Страница 95: ...11 Certificates D184B111U02 FCM2000 95 Fig 47...
Страница 96: ...11 Certificates 96 FCM2000 D184B111U02 Fig 48...
Страница 97: ...11 Certificates D184B111U02 FCM2000 97 Fig 49...
Страница 98: ...11 Certificates 98 FCM2000 D184B111U02 Fig 50...
Страница 99: ...11 Certificates D184B111U02 FCM2000 99 Fig 51...
Страница 100: ...11 Certificates 100 FCM2000 D184B111U02 11 3 PED Certificate of Compliance Fig 52...
Страница 101: ...11 Certificates D184B111U02 FCM2000 101 11 4 EHEDG Certificate Fig 53...