5.
Measure that the installation is de-energized. If the measurement requires removal or
disassembly of shrouding or other cabinet structures, obey the local laws and regulations
applicable to live working (including – but not limited to – electric shock and arc
protection).
•
Before and after measuring the installation, verify the operation of the voltage tester
on a known voltage source.
•
Make sure that the voltage between the drive input power terminals (L1, L2, L3)
and the grounding (PE) busbar is zero.
•
Make sure that the voltage between the drive output terminals (T1/U, T2/V, T3/W)
and the grounding (PE) busbar is zero.
•
Make sure that the voltage between the drive DC busbars (+ and -) and the
grounding (PE) busbar is zero.
WARNING!
The busbars inside the cabinet of liquid-cooled drives are partially coated.
Measurements made through the coating are potentially unreliable, so only
measure at uncoated portions. Note that the coating does not constitute a safe
or touch-proof insulation.
6.
If the drive is not equipped with a grounding switch, install temporary grounding as
required by the local regulations.
7.
Ask the person in control of the electrical installation work for a permit to work.
General notes
■
Static electricity
WARNING!
Use a grounding wristband when you handle printed circuit boards. Do not touch
the boards unnecessarily. The boards contain components sensitive to electrostatic
discharge.
■
Optical components
WARNING!
Obey these instructions. If you ignore them, damage to the equipment can occur.
•
Handle the fiber optic cables with care.
•
When you unplug the fiber optic cables, always hold the connector, not the cable itself.
•
Do not touch the ends of the fibers with bare hands as the ends are extremely sensitive
to dirt.
•
Do not bend the fiber optic cables too tightly. The minimum allowed bend radius is
35 mm (1.4 in).
Electrical installation 37
11
Содержание ACS880-307LC
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 307LC diode supply units Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 12: ...12 ...
Страница 34: ...34 ...
Страница 40: ...11 Reinstall the shrouding removed earlier 12 Close the door 3 PE PE 40 Electrical installation ...
Страница 41: ...10 9 7 6 8 Electrical installation 41 11 ...
Страница 73: ...11 12 12 6 10 Maintenance 73 ...
Страница 78: ...78 ...
Страница 88: ...88 ...
Страница 96: ... 400 mm wide input cubicle 96 Technical data ...
Страница 97: ... 600 mm wide incoming cubicle or input cubicle Technical data 97 ...