that is outside the supply unit cubicle. The drive switchgear is also outside the supply
unit cubicle. The switchgear includes a main disconnector and main contactor or
breaker.
■
Safety
Action
WARNING!
Obey the safety instructions during the start-up procedure. See
cooled multidrive cabinets and modules safety instructions (3AXD50000048633
[English])
. If you ignore the safety instructions, injury or death, or damage to the
equipment can occur.
If you are not a qualified electrical professional, do not do installation or mainten-
ance work.
■
Checks/Settings with no voltage connected
Action
Disconnect the drive from the AC power line and make sure it is safe to start the work. See section
Electrical safety precautions (page 56)
Make sure that the charging disconnector is open.
Make sure that the mechanical and electrical installation of the drive is completed. See
Check the settings of breakers/switches in the auxiliary circuits.
Make sure that the voltage settings of the auxiliary voltage transformers are according to the
actual power line voltage. See the final circuit diagrams by the designer of the cabinet-installed
drive.
■
Starting and checking the cooling system
Action
Fill up and bleed the internal cooling circuit. Start the cooling unit up. See
.
Check the cooling system for leaks.
Make sure that cooling circuit joints at the shipping split joining cubicles are tight and that all
drain valves have been closed.
Make sure that the coolant can flow freely in all cubicles.
Install all shrouds (if removed) and close the cabinet doors.
■
Powering up the auxiliary circuit of the drive
Action
Remove the temporary grounding system (if installed).
Close the circuit breakers supplying the auxiliary circuits.
76 Start-up
Содержание ACS880-304LC Series
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 304LC A019 diode supply modules Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 30: ...30 ...
Страница 34: ...34 ...
Страница 45: ... Kits for D8D supply modules in 400 mm Rittal VX25 or generic enclosure Cabinet construction 45 10 ...
Страница 46: ... Stage 1 Installation of common parts 46 Cabinet construction ...
Страница 47: ... Stage 2 Module installation parts Cabinet construction 47 10 ...
Страница 48: ... Stage 3 Liquid cooling system components 48 Cabinet construction ...
Страница 49: ... Stage 4 AC and DC busbar installation Cabinet construction 49 10 ...
Страница 50: ... Stage 5 AC and DC connection 50 Cabinet construction ...
Страница 51: ... Stage 6 Cabinet fan and heat exchanger Cabinet construction 51 10 ...
Страница 52: ... Stage 7 Shroud installation parts 52 Cabinet construction ...
Страница 53: ... Stage 8 Door covers and explosion exhaust kit Cabinet construction 53 10 ...
Страница 54: ...54 ...
Страница 74: ...74 ...
Страница 87: ...5 Maintenance 87 ...
Страница 88: ...6 7 8 9 9 88 Maintenance ...
Страница 92: ...92 ...
Страница 108: ...108 ...
Страница 118: ...118 ...
Страница 140: ...Liquid cooled D8D module Dimensions in mm 1 mm 0 0394 in 140 Dimension drawings ...
Страница 142: ...ZCU 14 control unit 142 Dimension drawings ...
Страница 143: ...Support plate for ZCU 14 UDZKROH 0 GRZQ UDZKROH 0 GRZQ Dimension drawings 143 ...
Страница 144: ...CIO 01 module 144 Dimension drawings ...
Страница 152: ...152 ...