
Description
Code
EMC&STO.
N/S
N=Basic variant (without STO; C4 EMC level);
S=Standard variant (integrated STO; C2(1~230V), C3(3~400V) or C4(3~230V) EMC
level).
Size. See the ratings table in the technical data.
02A6
Voltage rating.
4
•
1=1-phase 208 ... 240 V AC
•
2=3-phase 208 ... 240 V AC
•
4=3-phase 380 ... 480 V AC.
Control panel
The drive has an integrated control panel with a display and control keys.
For quick reference, there is an
ACS180 User interface guide (3AXD50000606696
.
Refer to
ACS180 Firmware manual (3AXD50000467860 [English])
for information
on how to use the interface, start-up the drive and modify settings and parameters.
Control panel 15
2
Control panel
Contents
•
Control panel
•
Home view and Message view
•
Options menu
•
Main menu
•
Submenus
Control panel
By default, ACS 180 has an integrated panel. If required, you can use external control
panels such as assistant control panel or a basic panel. For more information, refer
ACX-AP-x assistant control panel’s user’s manual
(3AUA0000085685 [English]) or
ACS-BP-S basic control panel’s user’s manual
(3AXD50000032527 [English])
1. Display - shows the
Home
view as default.
2. Main menu.
3. OK button - open the Main menu, select and save
settings.
4. Start button - start the drive.
5. Menu navigation buttons - move in the menus and
set values.
6. Stop button - stop the drive.
7. Back button - open the Options menu, and move
back in the menu.
8. Options menu.
9. Status light - green and red colors indicate the
state and potential problems.
1
2
3
4
5
6
7
d
e
e
c
a
b
Display (
Home view):
1
a) Control location: local or remote
b) Status icons
c) Reference target value
d) Actual measured value
e) Left and right softkey actions.
Back key (opens the Options view in the Home view)
2
OK key (opens the Menu in the Home view)
3
Operation principle and hardware description 33
Содержание ACS180-04S-03A7-1
Страница 1: ...ABB MACHINERY DRIVES ACS180 drives Hardware manual...
Страница 2: ......
Страница 4: ......
Страница 12: ...12...
Страница 24: ...24...
Страница 83: ...Make sure that The motor and the driven equipment are ready for power up Installation checklist 83...
Страница 84: ...84...
Страница 96: ...96...
Страница 146: ...146...
Страница 148: ...Frame R0 148 Dimension drawings...
Страница 149: ...Frame R1 Dimension drawings 149...
Страница 151: ...Frame R3 Dimension drawings 151...
Страница 152: ...Frame R4 152 Dimension drawings...
Страница 160: ...160...
Страница 180: ...Declarations of conformity 180 The Safe torque off function...
Страница 181: ...The Safe torque off function 181...
Страница 182: ...182 The Safe torque off function...
Страница 183: ...The Safe torque off function 183...
Страница 184: ...184...
Страница 187: ...Installation 1 2 N m M4x16 2x 3 3 3 2 2 2 2 Accessories 187...
Страница 189: ...Installation 3 3 2 2 2 3 2 2 N m M4x16 4x 1 Accessories 189...