Chapter 5 - Changing RC-IGCTs in 3/5 MVA Phase Modules
ABB
5-2 (2)
3BHS202077 ZAB E01 Rev. C
ACS 6000 Maintenance Manual
them on the new IGCT.
Figure 5-3
IGCT
6
Thoroughly clean the contact surfaces of the cooler and the anode
and cathode of the new RC-IGCT with an appropriate solvent (e. g.
alcohol). Using a fluff-free cloth wipe the surfaces paying attention not
to scratch the surfaces.
Note: Do not use any grease or any electrical joint compound.
7
Push the new RC-IGCT into the stack.
8
Tighten the pressure adjusting bolt until the gauge is released.
9
Fasten the gauge in its storage place.
10
Remount the retaining rods and fasten the RC-IGCTs.
11
Push the phase module back into the cabinet following the
instructions in section
4.3 Installing a Phase Module.
Retaining clamps
Guides
Содержание ACS 6000
Страница 6: ...ABB 4 4 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 14: ...Chapter 2 Checking IGCTs and Diodes ABB 2 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 20: ...Chapter 3 Changing Diodes and Thyristors in LSU ABB 3 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 30: ...Chapter 4 Changing 3 5 MVA Phase Modules ABB 4 10 10 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 68: ...Chapter 9 Changing Thyristors in EXU ABB 9 8 8 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 80: ...Chapter 11 Changing IGCTs in DIU ABB 11 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 104: ...Chapter 14 Tightening Torques and Threaded Connections ABB 14 4 4 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...