ABB
ACS 6000 Maintenance Manual
3BHS202077 ZAB E01 Rev. C
5-1 (2)
Chapter 5 - Changing RC-IGCTs
in 3/5 MVA Phase Modules
1
Follow section
4.2 Removing a Phase Module until the phase module
has been extracted from the cabinet.
The phase module can remain on the rails for replacing an RC-IGCT.
2
Loosen the hexagon fastening bolts (12) (see arrows in
Figure 5-1) of
the RC-IGCTs and pull out the two retaining rods.
Figure 5-1
Phase Module
3
Slide the clamp pressure loading gauge (attached to the side of the
phase module, see
Figure 5-1) under the clamp ring of the pressure
adjusting bolt and loosen the bolt to release the clamp pressure of the
stack.
Figure 5-2
Releasing the Clamp Pressure
4
Pull out the faulty RC-IGCT.
5
In case the new IGCT is not fitted with retaining clamps and guides
(see
Figure 5-3) remove these parts from the faulty IGCT and mount
Retaining rod
Clamp pressure
loading gauge
Retaining rod
Clamp pressure loading gauge
Clamp ring
Содержание ACS 6000
Страница 6: ...ABB 4 4 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 14: ...Chapter 2 Checking IGCTs and Diodes ABB 2 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 20: ...Chapter 3 Changing Diodes and Thyristors in LSU ABB 3 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 30: ...Chapter 4 Changing 3 5 MVA Phase Modules ABB 4 10 10 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 68: ...Chapter 9 Changing Thyristors in EXU ABB 9 8 8 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 80: ...Chapter 11 Changing IGCTs in DIU ABB 11 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 104: ...Chapter 14 Tightening Torques and Threaded Connections ABB 14 4 4 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...