Chapter 8 - Changing Diodes and IGCTs in 7/9 MVA Phase Modules
ABB
8-14 (18)
3BHS202077 ZAB E01 Rev. C
ACS 6000 Maintenance Manual
1
Deenergize the drive. See section
8.3 Safety.
2
Slide the clamp pressure loading gauge under the clamp ring of the
pressure adjusting bolt and remove the bolt to release the clamp
pressure of the stack using the 12 mm ½" hex socket from the tool
box.
Figure 8-18
Pressure Adjusting Bolt
3
Remove the top isolator disc from the stack.
Figure 8-19
Removing Top Isolator Disk
8.5
Replacing Free Wheeling Diodes
Pressure adjusting bolt
Top isolator disk removed
Содержание ACS 6000
Страница 6: ...ABB 4 4 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 14: ...Chapter 2 Checking IGCTs and Diodes ABB 2 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 20: ...Chapter 3 Changing Diodes and Thyristors in LSU ABB 3 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 30: ...Chapter 4 Changing 3 5 MVA Phase Modules ABB 4 10 10 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 68: ...Chapter 9 Changing Thyristors in EXU ABB 9 8 8 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 80: ...Chapter 11 Changing IGCTs in DIU ABB 11 6 6 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...
Страница 104: ...Chapter 14 Tightening Torques and Threaded Connections ABB 14 4 4 3BHS202077 ZAB E01 Rev C ACS 6000 Maintenance Manual...