![ABB ACQ580-34 Скачать руководство пользователя страница 143](http://html.mh-extra.com/html/abb/acq580-34/acq580-34_hardware-manual_2546143.webp)
Start-up
Contents of this chapter
This chapter describes the start-up procedure of the drive.
Start-up procedure
1. Only qualified electrical professionals are allowed to start-up the drive.
2. Make sure that the installation of the drive module has been checked according to the
checklist in chapter
Installation checklist
, and that the motor and driven equipment are
ready for start.
3. Perform the start-up tasks instructed by the cabinet-installer of the drive module.
4. Switch the power on, setup the drive control program, and perform the first start of the
drive and motor. See ACQ580 pump control program quick startup guide
(3AXD50000048773 [English]) or
ACQ580 pump control program firmware manual
(3AXD50000035867 [English])
5. For drive modules in which the Safe torque off function is in use: Test and validate the
operation of the Safe torque off function. See
Validation test procedure (page 201)
13
Start-up 143
12
Содержание ACQ580-34
Страница 1: ... ABB DRIVES FOR WATER ACQ580 34 drive modules Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 14: ...14 ...
Страница 24: ...24 ...
Страница 50: ...50 ...
Страница 60: ...60 ...
Страница 70: ...70 ...
Страница 94: ...94 ...
Страница 110: ...110 ...
Страница 122: ...122 ...
Страница 132: ...Dimension drawing 132 External control unit option P906 ...
Страница 140: ...140 ...
Страница 144: ...144 ...
Страница 164: ...164 ...
Страница 184: ...Standard configuration E208 and E210 included 184 Dimension drawings ...
Страница 185: ...Drive module with option B051 Dimension drawings 185 ...
Страница 186: ...Drive module with options B051 H370 186 Dimension drawings ...
Страница 187: ...LCL filter module Dimension drawings 187 ...
Страница 190: ...190 ...
Страница 208: ... Declaration of conformity 208 The Safe torque off function ...
Страница 214: ...214 ...
Страница 226: ...226 ...