Start-up including acceptance test
To ensure the safe operation of a safety function, validation is required. The final
assembler of the machine must validate the function by performing an acceptance test.
The acceptance test must be performed
•
at initial start-up of the safety function
•
after any changes related to the safety function (circuit boards, wiring, components,
settings, etc.)
•
after any maintenance work related to the safety function.
■
Competence
The acceptance test of the safety function must be carried out by a competent person
with adequate expertise and knowledge of the safety function as well as functional
safety, as required by IEC 61508-1 clause 6. The test procedures and report must be
documented and signed by this person.
■
Acceptance test reports
Signed acceptance test reports must be stored in the logbook of the machine. The report
shall include documentation of start-up activities and test results, references to failure
reports and resolution of failures. Any new acceptance tests performed due to changes
or maintenance shall be logged into the logbook.
■
Acceptance test procedure
After wiring the Safe torque off function, validate its operation as follows.
Action
WARNING!
Obey the safety instructions. If you ignore them, injury or death, or damage to the
equipment can occur.
Make sure that the drive can be run and stopped freely during start-up.
Stop the drive (if running), switch the input power off and isolate the drive from the power
line using a disconnector.
Check the STO circuit connections against the wiring diagram.
Close the disconnector and switch the power on.
190 The Safe torque off function
Содержание ACH480
Страница 1: ... ABB DRIVES FOR HVAC ACH480 drives Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 14: ...14 ...
Страница 22: ...22 ...
Страница 28: ...28 ...
Страница 38: ...38 ...
Страница 44: ...44 ...
Страница 60: ...60 ...
Страница 86: ...86 ...
Страница 110: ...110 ...
Страница 114: ...114 ...
Страница 122: ...122 ...
Страница 156: ...Frame R1 Frame R1 front side IP20 UL open type 156 Dimension drawings ...
Страница 157: ... Frame R1 bottom rear IP20 UL open type Dimension drawings 157 ...
Страница 158: ... Frame R1 front side UL Type 1 kit installed 158 Dimension drawings ...
Страница 159: ... Frame R1 bottom rear UL Type 1 kit installed Dimension drawings 159 ...
Страница 160: ...Frame R2 Frame R2 front side IP20 UL open type 160 Dimension drawings ...
Страница 161: ... Frame R2 bottom rear IP20 UL open type Dimension drawings 161 ...
Страница 162: ... Frame R2 front side UL Type 1 kit installed 162 Dimension drawings ...
Страница 163: ... Frame R2 bottom rear UL Type 1 kit installed Dimension drawings 163 ...
Страница 164: ...Frame R3 Frame R3 front side IP20 UL open type 164 Dimension drawings ...
Страница 165: ... Frame R3 bottom rear IP20 UL open type Dimension drawings 165 ...
Страница 166: ... Frame R3 front side UL Type 1 kit installed 166 Dimension drawings ...
Страница 167: ... Frame R3 bottom rear UL Type 1 kit installed Dimension drawings 167 ...
Страница 168: ...Frame R4 Frame R4 front side IP20 UL open type 168 Dimension drawings ...
Страница 169: ... Frame R4 bottom rear IP20 UL open type Dimension drawings 169 ...
Страница 170: ... Frame R4 front side UL Type 1 kit installed 170 Dimension drawings ...
Страница 171: ... Frame R4 bottom rear UL Type 1 kit installed Dimension drawings 171 ...
Страница 172: ...172 ...
Страница 180: ...180 ...
Страница 198: ... Declaration of conformity 198 The Safe torque off function ...
Страница 206: ...Dimensions 206 BIO 01 I O extension module ...
Страница 212: ...Dimensions 3AXD50000031148 rev A 212 BREL 01 relay output extension module ...