
Commissioning
System Manual 2CKA001473B5074
│53
LR1
Fig. 43: Inserting the batteries
4. Inserting the batteries of the "Electronic cylindrical lock".
click!
1
2
Fig. 44: Mounting the head housing
5. Remount the head housing of the reading head.
– Ensure that the contact protection remains within the head housing and does not buckle
during mounting.
Fig. 45: Maintenance card
6. Log the reading head into the "Smart Access Point Pro" with the maintenance card.
– To log in the reading head, change into the management software of the "Smart Access
Point Pro.
– For the necessary steps in the management software, see chapter 5.2.2 “Creating
floors“ on page 99.
– The reading head is added to the list of available devices.
7. Placing the reading head in the building structure of the "Smart Access Point Pro".
– To place the reading head, change into the management software of the "Smart Access
Point Pro.
– For the necessary steps in the management software, see chapter 5.4.3 “Placing the
"Electronic cylindrical lock"“ on page 120.
– If the building structure is not yet available, first create it, see chapter 5.3.2 “Add
"Electronic cylindrical lock"“ on page 105.