Presentation / operation
ABB Control - AC 31
Page 2-13
1SBC 260400 R1001-b
06.99
3.7.4. Initializing the central unit
Initialization of the central unit is necessary after any configuration of the central unit operative
mode in order for it to startup with the correct system configuration.
Click the
"Reset"
button in the control window to re-initialize the central unit. Wait for the
"Reset"
window and validate
"OK"
.
3.7.5. Sending the program to the PLC
Click on the
"Send"
button in the control window to automatically
send and save
the
program to the PLC.
Reply
"Yes"
to the first message
"Do you want to change the PLC program name?"
(Figure 2-17).
Wait for the second message
"EPROM is updated"
and validate
"OK"
(Figure 2-18).
3.7.6. On-line program tests
Set the RUN/STOP switch of the central unit to RUN.
Test 1:
Activation and deactivation of the input using the switch wired to the I62.00 input.
The output status can be visualized on the PLC as well as from the software, as shown in
Figure 2-19.
The input, internal bit and output signals may also be visualized in time by clicking on the
"Variable time diagrams"
icon in the control window.
Click on the
"
Insert variable"
icon in the
"Trace"
window in order to insert a variable
(Figure 2-20).
Select the
"I62.00 - IN1 - Switch"
variable and validate
"OK".
Follow the same procedure to insert the
"M00.00 - TEST"
internal bit.
Follow the same procedure to insert the
"O62.00 - OUT1 - Lamp"
variable
.
The input, internal bit and output signals are immediately traced in the
"Trace
"
window
(
Figure
2-20
).
Содержание AC 31
Страница 1: ...Technical Manual Advant Controller 31 40 50 Series 1SBC 260400 R 1001 b ...
Страница 7: ......
Страница 28: ...AC 31 technical documentation ABB Control AC 31 Page 2 1 1SBC 260400 R1001 b 06 99 Chapter 2 Getting started ...
Страница 43: ......
Страница 45: ...Technical specifications Page 3 2 ABB Control AC 31 1SBC 260400 R1001 b 06 99 ...
Страница 83: ......
Страница 84: ...AC 31 technical documentation ABB Control AC 31 Page 4 1 1SBC 260400 R1001 b 06 99 Chapter 4 Installation ...
Страница 85: ...Installation Page 4 2 ABB Control AC 31 1SBC 260400 R1001 b 06 99 ...
Страница 109: ......
Страница 110: ...AC 31 technical documentation ABB Control AC 31 Page 5 1 1SBC 260400 R1001 b 06 99 Chapter 5 Programming ...
Страница 130: ...Programming ABB Control AC 31 Page 5 21 1SBC 260400 R1001 b 06 99 ...
Страница 141: ...Programming Page 5 32 ABB Control AC 31 1SBC 260400 R1001 b 06 99 Figure 5 10 Duplicating inputs of a function block ...
Страница 154: ...AC 31 technical documentation ABB Control AC 31 Page 6 1 1SBC 260400 R1001 b 06 99 Chapter 6 Program Optimization ...
Страница 172: ...AC 31 technical documentation ABB Control AC 31 Page 7 1 1SBC 260400 R1001 b 06 99 Chapter 7 Communication ...
Страница 182: ...Communication ABB Control AC 31 Page 7 11 1SBC 260400 R1001 b 06 99 ...
Страница 189: ......
Страница 190: ...AC 31 technical documentation ABB Control AC 31 Page 8 1 1SBC 260400 R1001 b 06 99 Chapter 8 Diagnosis ...
Страница 191: ...Diagnosis Page 8 2 ABB Control AC 31 1SBC 260400 R1001 b 06 99 Figure 8 1 Error detection LEDs ...
Страница 195: ...Diagnosis Page 8 6 ABB Control AC 31 1SBC 260400 R1001 b 06 99 Figure 8 2 AC31GRAF status window ...
Страница 203: ......
Страница 204: ...AC 31 technical documentation ABB Control AC 31 Annexes Page 1 1SBC 260400 R1001 b 06 99 Annexes ...
Страница 217: ......
Страница 218: ...AC 31 technical documentation ABB Control AC 31 Index Page 1 1SBC 260400 R1001 b 06 99 Index ...