2.2 Installation Site
:
2.2.1
、
The
lift
is
designed
to
be
installed
inside
a
building
,
with
no
obstructions
in
the
space
and
good
ventilation.
The
installation
place
shall
not
be
close
to
the
washing
area,
paint,
coating,
corrosive
solvent
storage
area
and
areas
where
there
may
be
danger
of
electric
shock
or
explosion;
ensure
a
minimum
safe
distance
(more
than
2m)
from
walls
or
other
equipment,
and
avoid
emergency
passages.
2.2.2
、
All
sources
of
ignition
must
be
kept
away
from
the
installation
location
of
the
lift,
and
there
must
be
good
ventilation
around
the
lift.
2.3
Installation
foundation
requires
:
2.3.1
、
The
minimum
thickness
of
the
concrete
is
150mm;
the
strength
is
more
than
3000PSI.
2.3.2
、
The
foundation
ground
of
the
lift
needs
to
be
made
in
its
entirety,
and
no
pillar
can
be
made
separately
for
the
foundation,
and
the
deviation
of
the
ground
level
is
less
than
5mm.
2.3.3
、
The
lift
cannot
be
installed
on
two
or
more
layers
of
concrete
poured
at
different
times;
it
must
not
be
installed
on
the
floor
laid
with
tiles
or
other
decorative
materials.
2.3.4
、
Concrete
cannot
be
placed
directly
on
unconsolidated
ground.
2.3.5
、
After
the
concrete
is
poured,
you
must
wait
until
it
is
completely
cured
before
installing
the
lift;
adjust
the
installation
time
accordingly
according
to
the
different
seasons,
and
the
curing
time
must
be
more
than
30
days.
If
necessary,
perform
concrete
maintenance
work.
(Because
the
temperature
of
concrete
is
lower
than
5
℃,
its
strength
will
be
greatly
affected
even
after
solidification,
so
it
is
not
recommended
to
make
foundation
work
in
winter.)
III
、
Installation
Instructions
:
3.1
Before
installation,
roughly
determine
the
installation
position
of
the
equipment
3
Only the personnel designated by the manufacturer or the professional and technical
personnel entrusted by the dealer can install this equipment. The installers must have
qualifications for practice; non-professional installation may cause serious personal or
equipment injury.
Install as shown in the exploded view.
Содержание SXJS4019A
Страница 8: ...7 Main platform Steel Rope in Rear position Fig2 Main platform Steel Rope in Rear position Fig3 ...
Страница 9: ...8 Top view of steel rope general arrangement ...
Страница 28: ...27 The electrical schematic and wiring diagram of standard electrical four post lift as above figures ...
Страница 43: ...10 2 2 Warning mark ...
Страница 55: ...22 ...
Страница 56: ...23 Chapter 7 Hydraulic System 7 1 Hydraulic pressure principle drawing ...
Страница 60: ...29 ...
Страница 61: ...30 ...
Страница 62: ...31 ...
Страница 63: ...32 ...
Страница 64: ...33 ...
Страница 65: ...34 ...