![AAQ SXJS4019A Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/aaq/sxjs4019a/sxjs4019a_installation-manual-and-operation-instructions_449263012.webp)
11
Lift the main platform to points A and C, adjust the four holes on the head and tail of
the platform to precisely align with the four screw holes on the beam, and fine-adjust
if necessary; now screw the bolts into the screw holes, taking care not to tighten; Note
that the head of the platform is an M16 * 45 hexagonal bolt with a flat spring washer,
and the tail is an M16 * 45 hexagonal screw with a flat spring washer.
Bolts on the Head
Bolts on the tail
When placing the main platform, be careful not to squeeze the steel rope, and at the
same time thread the steeel rope into the channel steel of the beam according to the
following diagram.
Steel Rope Connection diagram-driving head position
Содержание SXJS4019A
Страница 8: ...7 Main platform Steel Rope in Rear position Fig2 Main platform Steel Rope in Rear position Fig3 ...
Страница 9: ...8 Top view of steel rope general arrangement ...
Страница 28: ...27 The electrical schematic and wiring diagram of standard electrical four post lift as above figures ...
Страница 43: ...10 2 2 Warning mark ...
Страница 55: ...22 ...
Страница 56: ...23 Chapter 7 Hydraulic System 7 1 Hydraulic pressure principle drawing ...
Страница 60: ...29 ...
Страница 61: ...30 ...
Страница 62: ...31 ...
Страница 63: ...32 ...
Страница 64: ...33 ...
Страница 65: ...34 ...