![AAQ SXJS4019A Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/aaq/sxjs4019a/sxjs4019a_installation-manual-and-operation-instructions_449263033.webp)
32
In the figure above, the pipe conversion bracket with the number 3 is fixed to the
jacking beam puller with the M8 × 16 hexagon socket screws with the number 1 and
the φ8 flat washer with the number 2.
The connecting plate of the tubing conversion bracket has a long slot. adjust the
distance between the round pipe part of the tubing conversion bracket and the bottom
of the guide rail groove of the auxiliary platform of the lift by about 5mm, and then
tighten the screws; pass the tubing installed on the carriage combination No. 7
through the tubing conversion bracket No. 3 round tube, adjust the combination of the
carriage closest to the oil tube conversion bracket to ensure that the distance between
the two components is about 100mm-150mm, and then use the M6 hexagon lock nut
with number 4 and the M6 × 16 with number 5. Hexagon screws and single pipe
clamp with serial number 6 fix the oil pipe to the upper part of the oil pipe conversion
bracket; finally, connect and tighten the oil pipe joint with the right-angle connector
installed on the jacking beam cylinder. See the position indicated by the arrow in the
figure below:
At this point, the machine is all installed. (See the names of the parts below
Содержание SXJS4019A
Страница 8: ...7 Main platform Steel Rope in Rear position Fig2 Main platform Steel Rope in Rear position Fig3 ...
Страница 9: ...8 Top view of steel rope general arrangement ...
Страница 28: ...27 The electrical schematic and wiring diagram of standard electrical four post lift as above figures ...
Страница 43: ...10 2 2 Warning mark ...
Страница 55: ...22 ...
Страница 56: ...23 Chapter 7 Hydraulic System 7 1 Hydraulic pressure principle drawing ...
Страница 60: ...29 ...
Страница 61: ...30 ...
Страница 62: ...31 ...
Страница 63: ...32 ...
Страница 64: ...33 ...
Страница 65: ...34 ...