7.4 Installation Procedure
I
MPORTANT
:
Always wear safety glasses while installing hoist.
T
OOLS
(
MINIMUM
REQUIRED
)
a.
Tape measure, 5m
b.
Chalk line
c.
1200mm level
d.
Carpenters Square
e.
10” adjustable wrench
f.
Open end wrenches 14mm,16mm,17mm,19mm
g.
Needle Nose pliers
h.
Snap Ring pliers
i.
Screw Drivers (Flat and Phillips)
j.
Hammer drill w/ 20mm diameter carbide-tipped bits
k.
2lb hammer
l.
Torque wrench: 150 ft.-lbs.
m.
Step ladder
L
AYOUT
1)
Layout the service bay according to
owners instructions
Failure to install in this
orientation can result in
personal and property damage.
D
ISASSEMBLY
2)
Place a piece of lumber 600mm from each end of
the packaged hoist. Remove Column
Extensions, Arms, and Hardware Box. Remove
steel end brackets bolted to Columns.
Remove remaining packaging and any loose items
placed inside the columns.
C
OLUMNS
3)
With columns still horizontal, assemble Power Column Extension to Power Column using (8
sets) M10 x 20 and (2 sets)M10X15 Hex bolts, flat washers, and lock washers . The (2) Column
Extensions are not identical.
IMPORTANT: The Lock Release Guide Block at top of Column
Extension should be in-line with Lock Release Pulley in Column.
For the tall height
setting, use bottom holes as shown in Fig 2. For the short setting, use the upper holes. Repeat for
opposite Idler Column and Idler Column Extension.
Fig 2 - Column Extension
17
Содержание AutoLift AL-9500HD
Страница 10: ...1140 635 950 1350 3550 9 2505 3615 ...
Страница 11: ...5 0 Introduction 5 1 Control Board WALL 1m WALL 3m Vehicle Enter 1m WALL Fig 1 10 ...
Страница 24: ...23 ...
Страница 29: ...10 0 Hydraulic System Diagram 28 ...
Страница 30: ...11 0 Balance Rope Diagram 29 ...
Страница 33: ...13 0 Parts List 32 ...
Страница 34: ...33 ...
Страница 35: ...34 ...
Страница 36: ...35 ...