Installation, Operation and Parts Manual
6
INSTALLATION INSTRUCTIONS
3.1 Preparations before installation
3.1.1 Tools and equipments needed
√ Electrical drill
√ Open wrenches
√ Screw drivers
√Adjustable spanner
AL-
3000AG (FL-8801)
3.2 Precautions for installation
3.2.2 Joints of oil hose must be firmly connected in order to avoid leakage.
3.2.3 All bolts should be firmly screwed up.
3.2.4 Do not place any vehicle on the
hoist
in the case of trial running.
3.3 Installation
Step1: Remove the packages and place the
hoist
as per the following drawing.
3.1.2 List for parts checking ---Annex 1
(
Packing list
)
Unfold the package and check if any parts missed as per Annex 1. Do not hesitate to contact us in case any parts missed, but if you do not
contact us and insist installing upon the lack of some parts, EverLift as well as our dealers will not bear any responsibility for this and will
charge for any parts subsequently demanded by the buyer.
3.1.3 Ground conditions
The
hoist
should be fixed on a smooth and solid concrete ground with its strength more than 3000psi, tolerance of flatness less than
5mm and minimum thickness of 200mm. In addition, newly built concrete ground must undergo more than 28days’ cure and
reinforcement.
Содержание AutoLift AL-3000AG
Страница 21: ...Installation Operation and Parts Manual 21 AL 3000AG FL 8801 Annex4 Wiring diagram Single phase ...
Страница 22: ...Installation Operation and Parts Manual 22 Three phase AL 3000AG FL 8801 ...
Страница 23: ...Installation Operation and Parts Manual 23 AL 3000AG FL 8801 ...
Страница 24: ...Installation Operation and Parts Manual 24 AL 3000AG FL 8801 ...
Страница 25: ...Installation Operation and Parts Manual 25 AL 3000AG FL 8801 ...
Страница 27: ...Installation Operation and Parts Manual 27 AL 3000AG FL 8801 For mechanical assembly ...