3000kg
Scissor
Hoist
OPERATING INSTRUCTIONS
The
hoist
should only be operated by personnel that have been
thoroughly trained in operation and maintenance of the
hoist
.
1.
Drive the vehicle evenly over the scissor platform and
apply the park brake.
2.
Install the four rubber lifting blocks to the underside of
the jacking points of the hoist.
3.
Make sure that all personnel are clear and there are no
obstructions around the
hoist
.
TO RAISE THE
HOIST
1.
Press the “UP” button on the control panel to
approximately 500mm above the floor.
2.
Check that the vehicle is evenly balanced on the
hoist
.
3.
Continue raising the
hoist
to the desired working height
checking for any obstructions.
4.
Once the
hoist
has reached the desired working height
press the lock button until the vehicle has rested on the
locks
Important: a visual check is to be made for correct
engagement of the locks prior to going under the
hoist
.
TO LOWER THE
HOIST
1.
Check for any obstructions under the
hoist
prior to
lowering
the
hoist
.
2.
Press the “DOWN” button on the control panel until the
locks are clear
Please note: the
hoist
will raise approximately 100mm
and
then will descend automatically.
3.
Once the
hoist
has reached its lowest position, remove
the
rubber supporting blocks.
4.
Turn the power switch to the off position on the control
panel.
Design Code: AS1418.9 -1996
MODEL:
AL-3000AG
SERIAL NO.:
APPROVALS:
WAH2160
Содержание AutoLift AL-3000AG
Страница 21: ...Installation Operation and Parts Manual 21 AL 3000AG FL 8801 Annex4 Wiring diagram Single phase ...
Страница 22: ...Installation Operation and Parts Manual 22 Three phase AL 3000AG FL 8801 ...
Страница 23: ...Installation Operation and Parts Manual 23 AL 3000AG FL 8801 ...
Страница 24: ...Installation Operation and Parts Manual 24 AL 3000AG FL 8801 ...
Страница 25: ...Installation Operation and Parts Manual 25 AL 3000AG FL 8801 ...
Страница 27: ...Installation Operation and Parts Manual 27 AL 3000AG FL 8801 For mechanical assembly ...