79
Before connection to the unit the condenser
water system must be flushed to remove
foreign material that could cause condenser
fouling. A screen strainer with a minimum of
20 Mesh is provided ahead of the condenser
inlet to prevent condenser fouling and
internal tube damage.
Mineral content of the condenser water must
be controlled. All makeup water has minerals
in it and as the water is evaporated in the
cooling tower, these minerals remain. As the
mineral content of the water increases, the
conductivity of the water increases.
Field provided and installed water treatment
program must be compatible with stainless
steel, copper, aluminum, ABS plastic, and
PVC. Batch feed processes must never be
used as concentrated chemicals can cause
corrosion. Never use hydrochloric acid
(muriatic acid) or chlorine as it will corrode
stainless steel.
NOTE:
Ball valves must be installed in the
condenser water supply and return lines for
unit isolation and water flow balancing. All
manual flow valves must be of the ball valve
design. Globe or gate valves must not be used
due to high pressure drops and poor throttling
characteristics.
Pressure
and
temperature
ports
are
recommended in condenser water supply and
return lines for system balancing. These
openings must be 5 to 10 pipe diameters from
the unit water connections. To allow for
mixing and temperature stabilization, wells
in the water piping must extend at least ½
pipe diameter into the pipe.
WATER PIPING
Follow national and local codes when
installing water piping. Connections to
the unit must incorporate vibration
eliminators to reduce noise and
vibration
and shutoff valves
to
facilitate servicing. Supply and return
water piping must be at least as large
as the unit connections and larger
depending on length of runs, rise and
bends.
CAUTION
PVC (Polyvinyl Chloride) and CPVC
(Chlorinated Polyvinyl Chloride) are
vulnerable
to attack by certain
chemicals. Polyolester (POE) oils
used
with
R-410A
and
other
refrigerants, even in trace amounts, in
a PVC or CPVC piping system will
result in stress cracking of the piping
and fittings and complete piping
system failure.
CAUTION
Each heat
exchanger
may
be
equipped with a refrigerant pressure
relief device to relieve pressure
should
excessive
condensing
pressures (>675 psig) occur. Codes
may require installing contractor to
connect and route relief piping
outdoors.
The relief valve has a 5/8”
male flare outlet connection.
CAUTION
Содержание RN Series
Страница 2: ......
Страница 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Isolator Locations ...
Страница 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Isolator Locations ...
Страница 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Isolator Locations ...
Страница 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Isolator Locations ...
Страница 36: ...36 Figure 9 Steel Mounting ...
Страница 102: ...102 Figure 56 Example 6 50 60 70 ton through the Base Gas Piping ...
Страница 105: ...105 Gas Heater Operating Instructions Figure 58 Gas Heater Instructions ...
Страница 129: ...Maintenance Log E Coated Coil ...