
30
Table 3 - C Cabinet Unit Clearances
Location
Unit Size
16-25 and 30 tons
Front -
(Controls Side)
48”
Back - (Outside
Air)
48”
*Left Side
*6”
Right Side
60”
Top
Unobstructed
*Units with a water-cooled condenser or
chilled water coil require 48” of clearance
on the left side for service access.
Figure 2 - RN Series A, B and C Cabinet,
6-25 and 30 tons
Table 4 - D Cabinet Unit Clearances
Location
Unit Size
26 and 31-70 tons
Front -
(Controls Side)
48”
Back - (Outside Air)
48”
*Left Side
*48”
*Right Side
*70”
Top
Unobstructed
*Right and left side unit clearances are
interchangeable on units that do not have
hydronic heating. Units with hydronic
heating require 70” right side access for
service.
Figure 3 - RN Series D Cabinet,
26, 31-50, 60 and 70 tons
Table 5 - E Cabinet Unit Clearances
Location
Unit Size
55, 65 and 75-140
tons
Front -
(Controls Side)
60”
Back - (Outside
Air)
100” from end of
the unit
Left Side
72”
Right Side
72”
Top
Unobstructed
Figure 4 - RN Series E Cabinet,
55, 65 and 75-140 tons
Se tting the Curb
Make openings in roof decking large enough
to allow for duct penetration and workspace
only. Do not make openings larger than
necessary. Set the curb to coincide with the
openings. Make sure the curb is level. Unit
must be level in both horizontal axes to
support the unit and reduce noise and
vibration.
Front
Right Side
Back
OA
Back
Right Side
Controls
Front
Left Side
Содержание RN Series
Страница 2: ......
Страница 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Isolator Locations ...
Страница 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Isolator Locations ...
Страница 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Isolator Locations ...
Страница 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Isolator Locations ...
Страница 36: ...36 Figure 9 Steel Mounting ...
Страница 102: ...102 Figure 56 Example 6 50 60 70 ton through the Base Gas Piping ...
Страница 105: ...105 Gas Heater Operating Instructions Figure 58 Gas Heater Instructions ...
Страница 129: ...Maintenance Log E Coated Coil ...