
128
Electric Preheating
Limit Lockout
Aux. Limit Lockout
Outside Air Temperature Setpoint ________°F
Preheat Leaving Air Temperature Setpoint ________°F
Stage
Amps
Stage
Amps
1
5
2
6
3
7
4
8
Maintenance Log
This log must be kept with the unit. It is the responsibility of the owner and/or maintenance/service
contractor to document any service, repair or adjustments. AAON Service and Warranty
Departments are available to advise and provide phone help for proper operation and replacement
parts. The responsibility for proper start-up, maintenance and servicing of the equipment falls to
the owner and qualified licensed technician.
Entry
Date
Action Taken
Name/Tel.
Содержание RN Series
Страница 2: ......
Страница 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Isolator Locations ...
Страница 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Isolator Locations ...
Страница 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Isolator Locations ...
Страница 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Isolator Locations ...
Страница 36: ...36 Figure 9 Steel Mounting ...
Страница 102: ...102 Figure 56 Example 6 50 60 70 ton through the Base Gas Piping ...
Страница 105: ...105 Gas Heater Operating Instructions Figure 58 Gas Heater Instructions ...
Страница 129: ...Maintenance Log E Coated Coil ...