
40
Seismic Curb Installation
Using a standard curb with a seismic unit
will void the certification of the unit. All
mounting details listed must be followed to
achieve seismic certification. The AAON
unit must be certified to ICC-ES AC156
when using a seismic curb for seismic
certifications to apply. Any deviations or
modifications to the unit or curb will void all
seismic certification.
Structural engineer of record must approve
field provided building anchorage to unit or
curb in compliance with OSP-0180-10. Use
provided self tapping screws to attach base
of unit to seismic curb bracket.
Figure 15 - Solid Bottom Seismic Curb with Filters
Содержание RN Series
Страница 2: ......
Страница 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Gasket Locations...
Страница 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Gasket Locations...
Страница 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Gasket Locations...
Страница 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Gasket Locations...
Страница 42: ...42 Figure 19 Seismic Rigid Mount Curb...
Страница 71: ...71 12 Apply power to wheel and ensure that the wheel rotates freely without interference Belt Replacement...
Страница 80: ...80 Gas Heater Instructions Figure 43 Gas Heater Instructions...
Страница 113: ......
Страница 114: ......
Страница 115: ......