Special attention should be paid to the following when laying out each base and anchor:
•
The two anchors should line up with the pin holes on the hinge. If a line is drawn
between the two anchors, the line should go through the center of the two pin holes.
•
All the anchors should be on the same horizontal level with the tower base so that
the pulling force from the two side anchors will be equal. Otherwise, the tower may
bend or breakdown when you fasten the rear cable.
Disclaimer:
Since
the
soil
conditions
vary
from
location
to
location,
please
consult
with
a
soil
analysis
company
or
structural
engineering
firm
in
your
area
about
the
structural
data
in
this
manual.
Please
understand
that
A&C
will
not
responsible
for
the
structural
failure
caused
by
the
tower
base
problems.
Step
2:
Preparing
the
Concrete
Bases
for
the
Tower
and
the
Anchors
1. Dig the holes to follow the pattern as shown in Fig.1. Please refer to the Table 1 for the
dimensions of the holes.
2. Please choose cement C25. The 4 anchors should be installed with the bolts being
plugged in the cement. The 4 anchors should be oriented in the way which is described
in step 1. Put the bolts in the cement before it cures.