Note:
It is recommended to use a torque wrench to tighten the blade nuts. This ensures an
even amount of pressure across the blade and will prevent possible warping or rotor
imbalance. Set the torque based on the followings table:
System
2KW
Torque
30NM+/-1
Disclaimer: Please follow the above table for the torque settings. Make sure the wrench
is calibrated properly. A&C will not be responsible for any damages caused by improper
tightening.
10. Tighten the screws following the order indicated in graph 6.
Graph 6
11. Bolt the hub and blades to the shaft, then install the nose cone.
PLEASE REFER TO THE MAINTANENCE SECTION OF THIS MANUAL TO GET TIPS ON
LUBRICATING AND OILING GENERATOR PARTS FOR PROLONGED TURBINE EFFICIENCY.
Step
4:
Preparation
before
erecting
the
tower
1. Connect the 4 guy wires to your tower. Connect the SIDE guy wires to the SIDE bases.
2. Connect the FRONT guy wire to a winch, tractor or truck.
2. Pass the other end of the wire cable or bracing cord over a heavy ladder or pulley
brace, which will serve as a Jin-pole.
Step
5:
Erecting
the
tower