AAFIRST EZYTAP Series Скачать руководство пользователя страница 7

Installation and Operating Instructions 

 

EZYTAP 75(T)/7800(T) Installation Instructions & Tips

 

 

The tap rotates 30 degrees each side. You can stop it rotating. 

1.

 

Rotate tap fully to one side. 

2.

 

Carefully remove grub screw at rear of tap. 

3.

 

Rotate tap a little further round and screw in grub screw. 

4.

 

If the grub screw can only be half screwed in, the tap should be secure and no longer rotate. 

5.

 

For ease of access to the grub screw, it is recommended that the tap rotation is fixed before installation. 

 

Tap is dripping intermittently.

 

The tap is used as a vent for the boiler and will vent when approaching top temperature. This is normal operation. 

 

Hot water is not hot enough.

 

Two dashes displayed on the tap instead of the “H” sign. This shows that the boiler has been turned off, maybe 

accidently. To re- set, press and hold ‘Power’ button for 8-10 seconds. 

 

How to connect the mains water from the UC800M Chiller to the EZYTAP75/75T or EZYTAP85/85T Boiler to create 

the EZYTAP7800/7800T or EZYTAP8800/8800T

 – Connect the ¼” J Guest pipe from the carbon filter to the ‘IN’ 

connection on the UC800M. Use a J Guest length of pipe to connect from ‘OUT’ on the UC800M to the ‘COLD IN’ on 

the EZYTAP75/75T. (See Page 7 for more information) 

 

SAFETY VALVE KIT (SVKIT) INSTALLATION INSTRUCTIONS WITH 

THE UC800M UNDERSINK CHILLER

 

The Safety Valve Kit is supplied the UC800M Under-sink Chiller. It MUST be installed with all UC800M chillers. 

The SVKIT is designed to protect the Under-sink Installation from excessive pressure in the water system, because of ice build-up in the water 

tank, by venting water into a waste outlet. Failure to install the Safety Valve Kit could lead to a failure of fittings and pipework and potentially 

lead to a leak. 

 

Installation Instructions: 

 

Install the Safety Valve Kit between the outlet of the Chiller and the Tap (see illustration). The Safety Valve will release the pressure 

build up from expanded ice in the water tank by venting water into a waste. 

 

Using a 9.5mm drill bit, drill a hole in the side of the plastic sink waste drain. Then fit a PV36 14.3mm Grommet supplied into the 

drilled hole. Push John Guest ¼ “pipe from safety valve outlet into Grommet in sink waste drain. 

 

If there is no sink waste pipe available, we suggest you connect the pipe to a waste bottle that’ should be checked periodically and 

emptied. 

 

The SVKIT does not include a JG ¼” drain pipe which connects the SVKIT to the waste outlet (a quantity of pipe is already supplied 

with the UC800 equipment). Please note if no waste outlet is available the vent can be fed into a jerrycan. 

 

 
 
 
 
 

Содержание EZYTAP Series

Страница 1: ...Installation and Operating Instructions 1 EZYTAP Range Installation and Operating Instructions...

Страница 2: ...Installation and Operating Instructions 2 EZYTAP Range Breakdown...

Страница 3: ...unique opportunity to protect the Boiler from scale by connecting a proper Scale removal Filter to the Boiler water inlet side whilst connecting the Ambient or Chilled inlet to a simple odour and tas...

Страница 4: ...ter Pressure Max 50 PSI Tank Capacity 4 2 Litres Power 2000 Watts Mains Water Supply to Boiler Chilled Water to Cold In on Boiler via SVKIT Hot Water Outlet to Tap Hot Water Outlet to Tap Mains Water...

Страница 5: ...Instructions 5 Filter Configuration for Hard Soft Water EZYTAP 7800 7800T 8800 8800T Boiler Chiller and Tap EZYTAP In Hard Water Area EZYTAP In Soft Water Area EZYTAP In Hard Water Area EZYTAP 75 75T...

Страница 6: ...in relation to each other and to the TAP and mains inlet that the connecting hoses are not twisted or kinked NOTE Do not lengthen the hoses as this could impair performance You must PRIME THE HOT TAN...

Страница 7: ...75T See Page 7 for more information SAFETY VALVE KIT SVKIT INSTALLATION INSTRUCTIONS WITH THE UC800M UNDERSINK CHILLER The Safety Valve Kit is supplied the UC800M Under sink Chiller It MUST be instal...

Страница 8: ...Boiler for ease of handling 3 Drain the Boiler from underneath by unscrewing the drain cap Once drained re fit the drain cap 4 Using a funnel to pour the Descaling Solution into hot water outlet at th...

Страница 9: ...r boiler of the Ezytap75 7800 range This has implications for installation and servicing Please refer back to the EZYTAP Range Installation and Operating Instructions Apart from the high capacity 8 Li...

Страница 10: ...ot Water Outlet to Tap Vent Connected to Tap Cold Water Supply Inlet Cold Water Outlet to Tap Cold Water Supply to Boiler Hot Water Outlet to Tap Vent Connected to Tap Cold Water Supply Inlet Cold Wat...

Страница 11: ...islation NOTE The Boilers and Chillers must be so positioned in relation to each other and to the TAP and mains inlet that the connecting hoses are not twisted or kinked NOTE Do not lengthen the hoses...

Страница 12: ...a J Guest length of pipe to connect from OUT on the UC800M to the COLD IN on the EZYTAP75 75T See Page 7 for more information SAFETY VALVE KIT SVKIT INSTALLATION INSTRUCTIONS WITH THE UC800M UNDERSIN...

Страница 13: ...uter casing by unscrewing the screws holding the boiler casing in place and carefully remove the boiler casing and set it aside 5 For 85 8800 expose the level probes by locating the 3 level probes on...

Страница 14: ...d Operating Instructions 14 Error codes 85 T 8800 T Distributed by Cedar House Grange Farm Long Lane Newbury RG14 2TF TEL 44 0 01635 202489 FAX 44 0 01635 202499 E Mail enquiries aafirst co uk http ww...

Отзывы: