
Installation and Operating Instructions
6
EZYTAP 75(T)/7800(T) Installation Instructions & Tips
1.
Determine a convenient location to mount the EZYTAP faucet on your worktop. This can be an existing faucet
hole, or you may need to drill a new 30/35mm hole into your worktop. If installing with the EZYTRAY refer to
the instructions provided with the EZYTRAY.
2.
Ensure adequate cupboard space and ventilation for installation of the boiler and chiller (If supplied)
3.
Ensure power is within 1.2 metres of the boiler and chiller (if supplied).
4.
Ensure a potable water source is available for connection to the units.
5.
Configure the filtration and plumbing connections according to your circumstance (see page 5)
Please note
all installations should include an installation rail with Water block and Pressure reducing valve.
6.
Do not
use an electrical extension cable.
7.
The thickness of the worktop must be less than 70mm.
8.
All electrical and plumbing connections must comply with local legislation.
NOTE:
The Boilers and Chillers must be so positioned in relation to each other and to the TAP and mains inlet that
the connecting hoses are not twisted or kinked.
NOTE:
Do not lengthen the hoses, as this could impair performance.
You must PRIME THE HOT TANK before activating the boiling element
.
1.
Once the water connections have been made, power on at the mains plug and switch on the circuit breaker.
Two dashes will be displayed on the tap.
2.
Press ‘Safety’ button and then the ‘Hot’ button to start water flow into the hot tank.
3.
When water starts to come through tap, press ‘Hot’ button to stop the flow.
4.
Press and hold ‘Power’ button for 8-10 seconds. ‘H’ will start flashing, instead of the two dashes, on the tap.
5.
Solid ‘H’ means the hot water is up to temperature and ready for use.
6.
Repeat point 2 to dispense hot water.
NOTE:
Please follow the procedures above and below for first-time use
EZYTAP75(T)7800(T)
NOTE:
Dry start will damage the tank and void the
warranty.
STEP 1
After installation, ensure the water supply is
switched on. Switch on at the mains plug and
circuit breaker. Two dashes will be displayed on
the tap.
*** Press the “SAFETY”
STEP 2
STEP 3
*** Press the button “HOT”
Do not turn it off until water flows out from
the tap.
*** Press the button “POWER ON/OFF”
Hold for 8 seconds to turn the power on.