AAFIRST EZYTAP Series Скачать руководство пользователя страница 11

Installation and Operating Instructions 

11 

 

EZYTAP 85(T)/8800(T) Installation Instructions & Tips

 

 

1.

 

Determine a convenient location to mount the EZYTAP faucet on your worktop. This can be an existing 

faucet hole, or you may need to drill a new 30/35mm hole into your worktop. If installing with the EZYTRAY 

refer to the instructions provided with the EZYTRAY. 

2.

 

Ensure adequate cupboard space and ventilation for installation of the boiler and chiller (If supplied) 

3.

 

Ensure power is within 1.2 metres of the boiler and chiller (if supplied). 

4.

 

Ensure a potable water source is available for connection to the units.  

5.

 

Configure the filtration and plumbing connections according to your circumstances (see page 5) 

Please note 

all installations should include an installation rail with Water block and Pressure reducing valve.

 

6.

 

Do not

 use an electrical extension cable. 

7.

 

The thickness of the worktop must be less than 70mm. 

8.

 

All electrical and plumbing connections must comply with local legislation. 

 

NOTE: 

The Boilers and Chillers must be so positioned in relation to each other and to the TAP and mains inlet 

that the connecting hoses are not twisted or kinked.

 

NOTE: 

Do not lengthen the hoses, as this could impair performance.  

 

9.

 

Once the water connections have been made, power on at the mains plug and switch on the circuit breaker 

on. Two dashes will be displayed on the tap. 

10.

 

Hold down the power button for 8 secs to power the machine on. 

11.

 

It will show LO on the tap (it will show this until the water reaches the bottom probe and will then change to 

a flashing H, which indicates the machine has started heating) 

12.

 

Once the H has become solid the machine is ready for use. 

13.

 

To dispense hot water, press the safety button and then press the hot button. To stop dispensing press the 

hot button again and the light will go out. 

14.

 

To dispense Ambient or chilled water press  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*** Press and Hold the Power button 

for 8 seconds to turn the power on 

*** Press the safety button and then the 

hot button to dispense hot water. 
Press the hot button to stop dispensing. 

*** Press the Ambient/chilled button to dispense 

Ambient/chilled water. 
Press the Ambient/chilled button to stop dispensing. 

Содержание EZYTAP Series

Страница 1: ...Installation and Operating Instructions 1 EZYTAP Range Installation and Operating Instructions...

Страница 2: ...Installation and Operating Instructions 2 EZYTAP Range Breakdown...

Страница 3: ...unique opportunity to protect the Boiler from scale by connecting a proper Scale removal Filter to the Boiler water inlet side whilst connecting the Ambient or Chilled inlet to a simple odour and tas...

Страница 4: ...ter Pressure Max 50 PSI Tank Capacity 4 2 Litres Power 2000 Watts Mains Water Supply to Boiler Chilled Water to Cold In on Boiler via SVKIT Hot Water Outlet to Tap Hot Water Outlet to Tap Mains Water...

Страница 5: ...Instructions 5 Filter Configuration for Hard Soft Water EZYTAP 7800 7800T 8800 8800T Boiler Chiller and Tap EZYTAP In Hard Water Area EZYTAP In Soft Water Area EZYTAP In Hard Water Area EZYTAP 75 75T...

Страница 6: ...in relation to each other and to the TAP and mains inlet that the connecting hoses are not twisted or kinked NOTE Do not lengthen the hoses as this could impair performance You must PRIME THE HOT TAN...

Страница 7: ...75T See Page 7 for more information SAFETY VALVE KIT SVKIT INSTALLATION INSTRUCTIONS WITH THE UC800M UNDERSINK CHILLER The Safety Valve Kit is supplied the UC800M Under sink Chiller It MUST be instal...

Страница 8: ...Boiler for ease of handling 3 Drain the Boiler from underneath by unscrewing the drain cap Once drained re fit the drain cap 4 Using a funnel to pour the Descaling Solution into hot water outlet at th...

Страница 9: ...r boiler of the Ezytap75 7800 range This has implications for installation and servicing Please refer back to the EZYTAP Range Installation and Operating Instructions Apart from the high capacity 8 Li...

Страница 10: ...ot Water Outlet to Tap Vent Connected to Tap Cold Water Supply Inlet Cold Water Outlet to Tap Cold Water Supply to Boiler Hot Water Outlet to Tap Vent Connected to Tap Cold Water Supply Inlet Cold Wat...

Страница 11: ...islation NOTE The Boilers and Chillers must be so positioned in relation to each other and to the TAP and mains inlet that the connecting hoses are not twisted or kinked NOTE Do not lengthen the hoses...

Страница 12: ...a J Guest length of pipe to connect from OUT on the UC800M to the COLD IN on the EZYTAP75 75T See Page 7 for more information SAFETY VALVE KIT SVKIT INSTALLATION INSTRUCTIONS WITH THE UC800M UNDERSIN...

Страница 13: ...uter casing by unscrewing the screws holding the boiler casing in place and carefully remove the boiler casing and set it aside 5 For 85 8800 expose the level probes by locating the 3 level probes on...

Страница 14: ...d Operating Instructions 14 Error codes 85 T 8800 T Distributed by Cedar House Grange Farm Long Lane Newbury RG14 2TF TEL 44 0 01635 202489 FAX 44 0 01635 202499 E Mail enquiries aafirst co uk http ww...

Отзывы: