![AADI RDCP600 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/aadi/rdcp600/rdcp600_deployment-manual_448467016.webp)
Page 16
JANUARY 2010 - TD 220a DEPLOYMENT GUIDE, RDCP600
CHAPTER 1
Deployment Guide
Start the instrument by pressing the power
button at the rear of the instrument. Wait for
approximately 20 seconds before the LCD display at the front of the instrument is activated.
We recommend that you power the instrument from an AC/DC source when working with the
instrument in the office to avoid unnecessary drain of battery. Connect the AC/DC power cable
to the electrical terminal on the Top end plate.
IMPORTANT! Ensure that the protective cap is fitted and tightened to the electrical terminal
before deployment.