Page 12 09/2021
Installation and Operating Instructions
UPS Edition One 1kVA, 2kVA, 3kVA
2.3 Setup the UPS
Step 1: Battery installation (internal) Example 1kVA
Before you switch on the UPS, you must equip it with batteries according to the
specification. To do this, please proceed as follows:
Step 2: UPS input connection
■
Only connect the UPS to a two-pin, three-pole, earthed socket. Avoid the use
of extension cables.
■
For models with 208/220/230/240VAC:
The mains cable is included with the UPS.
Step 3: UPS output connection
■
For earthed type outlets, you can simply plug the power supplies of your
appliances into the outlets of your UPS.
■
For terminal-type inputs or outputs, please follow these steps for wiring
configuration:
a) Remove the small cover of the terminal block.
b) Use 2.5mm² mains cable for 3KVA (200/208/220/230/240VAC) models.
c) After completing the wiring, check that the wires are securely fastened.
d) Reattach the small cover to the back wall.
Battery
Battery
Main board