background image

5

For all side wall terminated, horizontally vented power vent, direct vent, and power direct vent gas fueled water heaters 

installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or 

operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished 

grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

 

INSTALLATION OF CARBON MONOXIDE DETECTORS

  At the time of installation of the side wall horizontal vented gas fueled 

equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up 

is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that 

a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building 

or structure served by the sidewall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure 

the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired 

carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall 

have a period of thirty (30) days to comply with the above requirements provided that during said thirty (30) day period, a battery 

operated carbon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS

  Each carbon monoxide detector as required in accordance with the above 

provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and CSA certified. 

SIGNAGE 

A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum 

height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating 

appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, 

“GAS VENT DIRECTLY 

BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS.”

INSPECTION 

 The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the 

installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance 

with the provisions of 248 CMR 5.08(2)(a) 1 through 4. 

EXEMPTIONS

: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4: 

1. The equipment listed in Chapter 10 entitled “Equipment Not Required To Be vented” in the most current edition of NFPA 54 

as adopted by the Board; and 

2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the 

dwelling, building, or structure used in whole or in part for residential purposes. 

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED

 When the manufacturer of Product  

Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the 

equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1. Detailed instructions for the installation of the venting system design or the venting system components; and

2. A complete parts list for the venting system design or venting system. 

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED

  When the manufacturer 

of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue 

gases, but identifies “special venting systems,” the following requirements shall be satisfied by the manufacturer:

1. The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and 

2. The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a 

parts list and detailed installation instructions. 

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting 

instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or  

equipment at the completion of the installation.  

INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS

Содержание VF VB 500

Страница 1: ...e any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installati...

Страница 2: ...nces known to the State of California to cause cancer birth defects or other reproductive harm and requires businesses to warn of potential exposure to such substances This product contains a chemical...

Страница 3: ...3 GENERAL SAFETY...

Страница 4: ...trol assembly pro vided on the boiler met safe lighting and other performance criteria Detailed installation diagrams are found in this manual These diagrams will serve to provide the installer a refe...

Страница 5: ...tally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS INSPECTION The st...

Страница 6: ...6 CONNECTION DIAGRAM...

Страница 7: ...7...

Страница 8: ...8 Figure 1 SCHEMATIC DIAGRAM VB VW 500 750 1000 SCHEMATIC DIAGRAM...

Страница 9: ...9 LIGHTING OPERATION INSTRUCTIONS FOR MODELS VB VW 500 750 AND 1000...

Страница 10: ...stem or something similar Through this connection multiple boilers can also be linked together CAUTION The internal communications cables should never be connected to the external communications conne...

Страница 11: ...me rod is missing or shorted the flame will not be detected OUTPUTS FROM MCB Relay Contact Output Alarm MCB 24VAC optional Provides electrical power to operate an external alarm This can be an audio d...

Страница 12: ...u activated screens Within each of the screens helpful information can be displayed by pressing the Help button The LED s visually inform the user about the mode the system is in The touch switches al...

Страница 13: ...jump to the error state Description of FCB control states Idle State When any error is declared during idle state The system will remain in this state until the MCB request a heating cycle or a cold...

Страница 14: ...to change the automatically resettable High Limit Setpoint 1 Press the MENU key 2 Scrollthe withtheDOWNkeynexttoUSERSETTINGSCREEN 3 Press the SELECT key 4 Scroll the with the DOWN key until it is poin...

Страница 15: ...rds in screens to reach a desired item and to change setpoints and user settings They have an auto increment decrement feature for some of the configurations and values When you first press one of the...

Страница 16: ...ected wiring Note The MRHL can be checked by disconnecting the outlet probe from the MCB and reading the resistance across the two active pins on the connectorattheendoftheprobecable Thevalueshouldbea...

Страница 17: ...Give reasonably quiet operation during initial ignition operation and extinction Cause no excessive lifting of flame from burner ports If the preceding burner characteristics are not evident check fo...

Страница 18: ...ible shortened service life BURNER MAINTENANCE Qualified servicers should follow this procedure when the boiler s burner needs cleaning 1 Turn off the electrical power to the boiler and close the main...

Страница 19: ...solidsexist Asthewaterisheated these tendtodropoutdepositingasscaleorlime Thisscalemustberemoved before the heat exchanger tubes become blocked DELIMING The amount of calcium carbonate lime released f...

Страница 20: ...20 notes...

Страница 21: ...21 notes...

Страница 22: ...22 notes...

Страница 23: ...ation for the boiler or any of its parts Some states and provinces do not allow limitations on how long an implied warranty lasts so the above limitation may not apply to you 5 CLAIM PROCEDURE Any cla...

Страница 24: ...24 500 Tennessee Waltz Parkway Ashland City TN 37015 Technical Support 800 527 1953 Parts 800 433 2545 Fax 800 644 9306 www hotwater com...

Отзывы: