Fig. Example concentric venting system
IMD-0791 R0
Caution
During installation, obey the instructions delivered with the sets of air supply components
and the flue gas discharge components. Make sure that the venting system does not
exceed the maximum number of 45º and 90º bends and the maximum pipe length.
Caution
Use a run-off of 50 mm per meter towards the water heater.
Refer to the table for the correct pipe dimensions of the C13 and C33 concentric systems.
Description
Unit
SGS 28 - 60
SGS 80 - -120
Diameter flue discharge/
air inlet
mm/mm
100/150
130/200
Maximum length
m
40
15
Maximum number of 45º and
90º bends
-
7
4
Caution
Both conditions stated in the table must be fulfilled.
Even if you use less than the stated maximum number of bends, the maximum pipe
length still may not be exceeded.
Even if you use less than the stated maximum pipe length, the maximum number of
bends still may not be exceeded.
7.7.2
C13/C33 parallel systems
Use a wall terminal set or a roof terminal set to install a C13 or a C33 parallel venting
system.
Description Parallel
Venting material
SGS 28 - 60
SGS 80 - 120
Manufacture venting material Muelink & Grol
Muelink & Grol
Construction
Parallel
Parallel
Material flue gas outlet
Thick walled aluminum Thick walled aluminum
Material air inlet
Diameter flue gas outlet
100
+0,6
/
-0,6
mm
130
+0,6
/
-0,6
mm
Diameter air inlet
Description parts
A.O. Smith Part
number
A.O. Smith Part
number
Wall terminal
(1)
0302505
0302313
c
c
62
Installation, Maintenance and Service part
Содержание SGS-28
Страница 6: ...6 ...
Страница 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 40: ...40 User part ...
Страница 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41 ...
Страница 42: ...42 User part ...
Страница 82: ...82 Installation Maintenance and Service part ...
Страница 90: ...90 Installation Maintenance and Service part ...
Страница 104: ...104 Installation Maintenance and Service part ...
Страница 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part ...
Страница 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part ...
Страница 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121 ...
Страница 124: ...124 Installation Maintenance and Service part ...
Страница 126: ...126 Installation Maintenance and Service part ...