7.4.1.4
Condensation drain
Fit a sloping waste water pipe to the condens trap (13) for condensation drainage
and connect this via an open connection to the waste water discharge.
Caution
If the condensation drain is not fitted to the waste water discharge using an open
connection, this can cause faults.
7.4.2
Vented water connections
Warning
The installation should be carried out by a competent person, in compliance with general
and locally applicable regulations.
7.4.2.1
Cold water side
See (A) in the installation diagram.
Fit an approved stop valve (4) on the cold water side between the cold water head
tank (18) and the water heater, as required by applicable regulations.
7.4.2.2
Hot water side
See (B) in the installation diagram.
Note
Insulating long hot water pipes prevents unnecessary energy loss.
Fit the T&P valve (3).
Optional: fit a temperature gauge (12) so you can check the temperature of the tap
water.
Fit a stop valve (4) in the hot water outlet pipe for servicing.
If a circulation pipe is required, continue by installing the circulation pipe (see section
7.4.1.3).
7.4.2.3
Circulation pipe
See (C) in the installation diagram.
If an immediate flow of hot water is required at draw-off points, a circulation pump can be
installed. This improves comfort, and reduces water wastage.
Fit a circulation pump (6) of the correct capacity for the length and resistance of the
circulation system.
Fit a non-return valve (5) after the circulation pump to guarantee the direction of
circulation.
Fit two stop valves for servicing (4).
Connect the circulation pipe according to the installation diagram.
7.4.2.4
Condensation drain
Fit a sloping waste water pipe to the condens trap (13) for condensation drainage
and connect this via an open connection to the waste water discharge.
Caution
If the condensation drain is not fitted to the waste water discharge using an open
connection, this can cause faults.
1.
c
w
1.
n
1.
2.
3.
4.
1.
2.
3.
4.
1.
c
58
Installation, Maintenance and Service part
Содержание SGS-28
Страница 6: ...6 ...
Страница 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 40: ...40 User part ...
Страница 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41 ...
Страница 42: ...42 User part ...
Страница 82: ...82 Installation Maintenance and Service part ...
Страница 90: ...90 Installation Maintenance and Service part ...
Страница 104: ...104 Installation Maintenance and Service part ...
Страница 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part ...
Страница 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part ...
Страница 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121 ...
Страница 124: ...124 Installation Maintenance and Service part ...
Страница 126: ...126 Installation Maintenance and Service part ...