Conditions....................................................................... 53
Ambient conditions........................................................... 53
Maximum floor load.......................................................... 53
Water composition............................................................54
Working clearances...........................................................54
Storage tank working clearances........................................ 55
Installation diagram..........................................................56
Water connections............................................................ 57
Unvented water connections.............................................. 57
Vented water connections.................................................. 58
Gas connection.................................................................59
Solar heating system........................................................ 59
Venting system................................................................ 59
C13/C33 concentric systems.............................................. 61
C13/C33 parallel systems.................................................. 62
C43/C53/C63 systems.......................................................64
Electrical connections........................................................ 65
Preparation......................................................................66
Mains power.................................................................... 66
Optional electrical connections............................................67
Electrical connection of the solar heating system...................68
Commissioning.................................................................70
Filling..............................................................................70
Procedure for checking the supply pressure..........................72
Procedure for checking the gas control valve pressure........... 74
adjustment............................................................... 75
Switching pressure measurement....................................... 77
Turn on the water heater...................................................78
Decommisioning...............................................................78
Conversion of gas type.............................................................. 81
Settings.....................................................................................83
9.1
Operator interface............................................................ 83
Service program...............................................................83
Hysteresis....................................................................... 83
Display the error history.................................................... 84
Display the water heater history......................................... 84
0311753_SGS_28-120_II_UKUK_V2.0 , 2017-05-03
11
Содержание SGS-28
Страница 6: ...6 ...
Страница 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 40: ...40 User part ...
Страница 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41 ...
Страница 42: ...42 User part ...
Страница 82: ...82 Installation Maintenance and Service part ...
Страница 90: ...90 Installation Maintenance and Service part ...
Страница 104: ...104 Installation Maintenance and Service part ...
Страница 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part ...
Страница 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part ...
Страница 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121 ...
Страница 124: ...124 Installation Maintenance and Service part ...
Страница 126: ...126 Installation Maintenance and Service part ...