background image

6

InstallatIon requIreMents for the coMMonwealth of Massachusetts

coMMonwealth of Massachusetts

For all side wall terminated, horizontally vented power vent, direct 

vent, and power direct vent gas fueled water heaters installed in 

every dwelling, building or structure used in whole or in part for 

residential purposes, including those owned or operated by the 

Commonwealth and where the side wall exhaust vent termination 

is less than seven (7) feet above finished grade in the area of 

the venting, including but not limited to decks and porches, the 

following requirements shall be satisfied:

InstallatIon of carBon MonoXIde detectors

At  the  time  of  installation  of  the  side  wall  horizontal  vented 

gas fueled equipment, the installing plumber or gasfitter shall 

observe  that  a  hard  wired  carbon  monoxide  detector  with  an 

alarm and battery back-up is installed on the floor level where 

the gas equipment is to be installed. In addition, the installing 

plumber  or  gasfitter  shall  observe  that  a  battery  operated  or 

hard wired carbon monoxide detector with an alarm is installed 

on  each  additional  level  of  the  dwelling,  building  or  structure 

served by the sidewall horizontal vented gas fueled equipment. 

It shall be the responsibility of the property owner to secure the 

services of qualified licensed professionals for the installation of 

hard wired carbon monoxide detectors.

In  the  event  that  the  side  wall  horizontally  vented  gas  fueled 

equipment is installed in a crawl space or an attic, the hard wired 

carbon monoxide detector with alarm and battery back-up may 

be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be 

met at the time of completion of installation, the owner shall have 

a period of thirty (30) days to comply with the above requirements 

provided that during said thirty (30) day period, a battery operated 

carbon monoxide detector with an alarm shall be installed.

approved carBon MonoXIde detectors

Each carbon monoxide detector as required in accordance with 

the above provisions shall comply with NFPA 720 and be ANSI/

UL 2034 listed and CSA certified.

sIGnaGe

A  metal  or  plastic  identification  plate  shall  be  permanently 

mounted to the exterior of the building at a minimum height of 

eight (8) feet above grade directly in line with the exhaust vent 

terminal for the horizontally vented gas fueled heating appliance 

or equipment. The sign shall read, in print size no less than one-

half (1/2) inch in size, 

“Gas vent dIrectlY Below. Keep 

clear of all oBstructIons.”

InspectIon

The  state  or  local  gas  inspector  of  the  side  wall  horizontally 

vented gas fueled equipment shall not approve the installation 

unless, upon inspection, the inspector observes carbon monoxide 

detectors and signage installed in accordance with the provisions 

of 248 CMR 5.08(2)(a) 1 through 4.

eXeMptIons

The following equipment is exempt from 248 CMR 5.08(2)(a)1 

through 4:

The equipment listed in Chapter 10 entitled “Equipment Not 

1. 

Required To Be Vented” in the most current edition of NFPA 

54 as adopted by the Board; and
Product Approved  side  wall  horizontally  vented  gas  fueled 

2. 

equipment installed in a room or structure separate from the 

dwelling,  building,  or  structure  used  in  whole  or  in  part  for 

residential purposes.

Manufacturer requIreMents - Gas 

equIpMent ventInG sYsteM provIded

When the manufacturer of Product Approved side wall horizontally 

vented  gas  equipment  provides  a  venting  system  design  or 

venting system components with the equipment, the instructions 

provided  by  the  manufacturer  for  installation  of  the  equipment 

and the venting system shall include:

Detailed instructions for the installation of the venting system 

1. 

design or the venting system components; and
A complete parts list for the venting system design or venting 

2. 

system.

Manufacturer requIreMents - Gas 

equIpMent ventInG sYsteM not provIded

When  the  manufacturer  of  a  Product  Approved  side  wall 

horizontally vented gas fueled equipment does not provide the 

parts  for  venting  the  flue  gases,  but  identifies  “special  venting 

systems,”  the  following  requirements  shall  be  satisfied  by  the 

manufacturer:

The  referenced  “special  venting  system”  instructions  shall 

1. 

be  included  with  the  appliance  or  equipment  installation 

 instructions; and 
The “special venting systems” shall be Product Approved by 

2. 

the Board, and the instructions for that system shall include a 

parts list and detailed installation instructions. 

A  copy  of  all  installation  instructions  for  all  Product Approved 

side wall horizontally vented gas fueled equipment, all venting 

instructions,  all  parts  lists  for  venting  instructions,  and/or  all 

venting  design  instructions  shall  remain  with  the  appliance  or  

equipment at the completion of the installation.

Содержание BTX-80 SERIES 100

Страница 1: ...MODEL BTX 80 SERIES 100 ALL TECHNICAL AND WARRANTY QUESTIONS SHOULD BE DIRECTED TO THE LOCAL DEALER FROM WHOM THE WATER HEATER WAS PURCHASED IF YOU ARE UNSUCCESSFUL PLEASE WRITE TO THE COMPANY LISTED...

Страница 2: ...alert symbol indicates a potentially hazardous situation which if not avoided could result in property damage WARNING CAUTION CAUTION DANGER All safety messages will generally tell you about the type...

Страница 3: ...3 GENERAL SAFETY INFORMATION...

Страница 4: ...4 GENERAL SAFETY INFORMATION at least 18 45 7cm above the floor This will reduce but not eliminate the risk...

Страница 5: ...d Cleveland OH44131 NFPAdocumentsarealsoavailablefromNational Fire Protection Association 1 Batterymarch Park Quincy MA 02269 3 The water heater when installed must be grounded in accordance with the...

Страница 6: ...feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch...

Страница 7: ...Exhaust Tee GG Elbow GET TO KNOW YOUR WATER HEATER GAS MODELS A Vent Pipe B Anode C Hot Water Outlet D Outlet 120 VAC F Gas Supply G Main Manual Gas Shut Off Valve H Ground Joint Union J Dirt Leg K O...

Страница 8: ...8 TYPICAL INSTALLATION CONDENSATE HOSE AND DRAIN PAN FIGURE 1 continued...

Страница 9: ...ship for normal adult skin If anyone using hot water provided by the water heater being installed fits into one of these groups or if there is a local code or state law requiring a certain water tempe...

Страница 10: ...cs All models Maximum Supply Pressure 14 inches W C 3 48kPa Minimum Supply Pressure Natural Gas 5 0 inches W C 1 24kPa Minimum Pressure must be maintained under both load and no load static and dynami...

Страница 11: ...talled in locations where leakage may result in property damage even with the use of a drain pan piped to a drain However unanticipated damage can be reduced or prevented by a leak detector or water s...

Страница 12: ...rine based chemicals refrigerants etc in addition to being highly flammable in many cases will also react to form corrosive hydrochloric acid when exposed to the combustion products of the water heate...

Страница 13: ...e the size of openings providing fresh air into confined spaces EXHAUST FANS Where exhaust fans are installed additional air shall be provided to replace the exhausted air When an exhaust fan is insta...

Страница 14: ...a reference for the openings that provide fresh air into confined spaces only Do not refer to these illustrations for the purpose of vent installation See Installation of Vent System on pages 19 26 fo...

Страница 15: ...e requirements or such conditions as high line pressure among others have installed devices such as pressure reducing valves check valves and back flow preventers Devices such as these cause the water...

Страница 16: ...the T P valve Secure all insulation using tape Temperature Pressure Relief Valve Explosion Hazard Temperature Pressure Relief Valve must comply with ANSI Z21 22 CSA 4 4 and ASME code Properly sized T...

Страница 17: ...P valve is not intended for the constant relief of thermal expansion Aproperly sized thermal expansion tank must be installed on all closed systems to control thermal expansion see Closed Water Syste...

Страница 18: ...system by closing itsindividualmanualShut offvalveduringanypressuretestingofthegas supply piping system at test pressures equal to or less than 1 2 pound per square inch 3 5 kPa Connecting gas piping...

Страница 19: ...uctions Assemble Vent Pipe Assemblies 1 2 and 3 See Figure 1 prior to cementing The preferred orientation of Vent Pipe Assembly 1 Condensate U Assembly is shown in Figure 16 However this assembly may...

Страница 20: ...0 cm 12 inches 30 cm K Clearance to a mechanical air supply inlet 6 feet 1 83 m 3 feet 91 cm above if within 10 feet 3 m horizontally E Clearance to unventilated soffit 12 inches 30 cm 12 inches 30 cm...

Страница 21: ...rectmaterialasdetailedabovehasbeenused andthatminimum ormaximumventlengthsandterminallocationasdetailedinthismanual have been met Carefully inspect entire venting system for any signs of cracks or fra...

Страница 22: ...hat the plastic tubing is still attached from the air pressure switch to the port on the blower housing Make sure the plastic tubing is not folded anywhere between the pressure switch and the blower h...

Страница 23: ...ine This will allow the vent to easily slide through the opening The resulting gap will be covered up by the Vent Terminal cover plate Repeat this step on inside wall if necessary SEQUENCE OF INSTALLA...

Страница 24: ...ighest anticipated snow level install a snorkel as shown in bottom portion of Figure 20 NOTE With the installation of a snorkel it is necessary to use two 90 elbows that shall be considered along with...

Страница 25: ...cement not included with kit and glue the two inch PVC pipe coming from the blower into the VAA 3 Perform the same sequence on the PVC pipe coming from the exhaust side vent terminal side of the VAA 4...

Страница 26: ...and the vent pipe system Air leaks will allow flue gas by products to disseminate into the room creating an unsafe environment and could cause illness asphyxiation and or even death FIGURE 24 Typical...

Страница 27: ...and above PRIMER It is recommended that Tetrahydrofuran THF be used to prepare the surfaces of pipe and fittings for solvent welding Do not use water rags gasoline or any other substitutes for cleanin...

Страница 28: ...make a second mark as the primer and cement will most likely destroy your first one Apply primer to the surface of the pipe and fitting socket with a natural bristle brush This process softens and pr...

Страница 29: ...R buttons together and holding for 1 second Then press the COOLER button until the WARM indicator light appears 2 Set the ON OFF switch on the blower control box to the OFF position 3 Turn off all ele...

Страница 30: ...c does not have access If a suitable area is not available a cover should be installed over the thermostat to prevent tampering Thewatertemperaturesettingwasfactorysetatthelowesttemperature Pressing t...

Страница 31: ...cal water heater supplier or service agency for further information concerning an Anode Replacement Kit and this chlorination treatment If the smelly water persists after the anode replacement and chl...

Страница 32: ...uld be made of the main burner and the hot surface igniter assembly for proper flame characteristics and ignition sequences This can be done by removing the Outer Door and viewing the main burner oper...

Страница 33: ...have a thermal expansion tank installed is not covered under the limited warranty Thermal expansion tanks must be installed on all closed water systems DO NOT PLUG THE TEMPERATURE PRESSURE RELIEF VALV...

Страница 34: ...ose connections or the relief valve DO NOT replace the water heater until a full inspection of all possible water sources is made and necessary corrective steps taken Leakage from other appliances wat...

Страница 35: ...control does not energize the blower replace the Intelli Vent control If the blower fails to Blower may run continuously in start when energized replace the blower assembly this condition 2 Ensure the...

Страница 36: ...ff for 10 20 seconds then on again to clear this error code 4 Ensure the flame sensor is clean use ultra fine steel wool or Scotch Brite pad to clean flame sensor 5 Ensure the hot surface ignitor is p...

Страница 37: ...in tolerance 1 Ensure air pressure switch hose is not kinked or clogged ensure the blower housing is clear of any condensation 2 Check vent temperature limit switch if it is determined that the vent t...

Страница 38: ...38 These guidelines should be utilized by a qualified service agent TROUBLESHOOTING GUIDELINES TROUBLESHOOTING GUIDELINES...

Страница 39: ...unless an effective method of controlling thermal expansion is also installed at the heater s and operational at all times The relief valve installed on the heater is not an acceptable method 4 SERVI...

Страница 40: ...40 500 Tennessee Waltz Parkway Ashland City TN 37015 Technical Support 800 527 1953 Parts 800 433 2545 Fax 800 644 9306 www hotwater com Copyright 2010 A O Smith Corporation All rights reserved...

Отзывы: