8.2.5 Placement of the water
heater
Before you install the water connections and gas
connections, place the water heater on the
correct position and make sure that the water
heater is level.
C
B
D
9
10
4
14
14
14
6
5
4
3
11
IMD-1331 R0
16
A
4
1
5
15
12
T
1. Pressure reducing valve
(mandatory if the mains water pressure is too high)
3. T&P valve (optional)
4. Stop valve (recommended)
5. Non-return valve
6. Circulation pump (optional)
9. Drain valve
10. Manual gas valve
11. Service stop valve
12. Temperature gauge (optional)
14. Draw-off point
15. Expansion valve
16. Expansion vessel
A. Cold water supply
B. Hot water outlet
C. Circulation pipe (optional)
D. Gas supply
Use this installation diagram when
you:
-
install the water connections
(see 8.4)
-
install the gas connection (see
8.5)
-
fill the water heater (see
8.7.1)
-
drain the water heater (see
8.8)
8.4 Water connections
8.4.1 Cold water connection
Install the cold water connection:
1. Install an approved stop valve (4), as
required by the applicable regulations (see
6).
2. Install an approved pressure reducing valve
(1) to prevent that the pressure in the cold
water supply pipe exceeds the maximum
working pressure of the tank, 8 bar. Refer to
the Technical details.
3. Install a non-return valve (5).
4. Install an expansion valve (15).
5. Connect the overflow connection of the
expansion valve, to an open waste water
pipe.
6. Install an expansion vessel (16).
8.4.2 Hot water connection
Note
Insulate long hot water pipes to prevent
unnecessary energy loss.
Install the hot water connection:
1. Install a stop valve (11) in the hot water
outlet pipe for service reasons.
2. If applicable, install a temperature gauge
(12).
3. Install a T&P valve (3).
8.4.3 Circulation connection
Install a circulation system when an immediate
flow of hot water at draw-off points is required.
This improves comfort and reduces water
wastage.
n
14
Installation, Maintenance and Service part
8.3 Installation diagram
Fig. Installation diagram
Warning
This appliance
must
be installed on a
non-
flammable
floor or surface.
w
Содержание BTL 100
Страница 2: ......
Страница 29: ...12 5 Declaration of conformity 0313126_BTL_UKUK_V1 1 30 11 2018 29...