Compare the CO
2
value measured against the value measured under full load.
The CO
2
value at partial load must be within ±0.3 vol% of the CO
2
value measured
or adjusted under full load.
If necessary, adjust the CO
2
value using the adjuster screw until the value is within
0.3 vol% of the CO
2
value under full load.
Fig. BFC 28 to 60 - CO
2
adjustment (partial load)
IMD-1095c R0
Fig. BFC 80 to 120 - CO
2
adjustment (partial load)
IMD-1097b R0
Note
Turning to the left (anticlockwise) means more less (lower CO
2
level) and turning to the
right (clockwise) means more gas (higher CO
2
level).
Note
After conversion, you must check that the gas control valve is gastight.
Remove the CO
2
measurement probe from the measurement nipple of the flue gas
outlet pipe.
Put the cap back on the measurement nipple of the flue gas outlet pipe.
Shut off the gas supply.
Replace the covers.
7.8.5
Switching pressure measurement
To measure the switching pressure, proceed as follows:
Isolate the appliance from the power supply (see section 4.2.2).
Carefully remove the covers from the appliance.
21.
22.
n
23.
24.
25.
26.
1.
2.
0311704_BFC_28-120_III_
ENEN_V2.4, 2022-10-17
73
Содержание BFC Cyclone 28
Страница 6: ...6...
Страница 13: ...User part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 13...
Страница 14: ...14...
Страница 16: ...16 User part...
Страница 18: ...18 User part...
Страница 24: ...24 User part...
Страница 41: ...Installation Maintenance and Service part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 41...
Страница 42: ...42 User part...
Страница 46: ...46 Installation Maintenance and Service part...
Страница 52: ...52 Installation Maintenance and Service part...
Страница 59: ...Fig Venting systems 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 59...
Страница 76: ...76 Installation Maintenance and Service part...
Страница 78: ...78 Installation Maintenance and Service part...
Страница 84: ...84 Installation Maintenance and Service part...
Страница 102: ...Fig Dimensions BFC 28 30 50 60 102 Installation Maintenance and Service part...
Страница 104: ...Fig Dimensions BFC 80 100 120 104 Installation Maintenance and Service part...
Страница 112: ...12 7 Declaration of conformity 112 Installation Maintenance and Service part...
Страница 113: ......
Страница 114: ......
Страница 118: ...116 Installation Maintenance and Service part...