7.4.1.4
Condensation drain
Fit a sloping waste water pipe to the condens trap (13) for condensation drainage
and connect this via an open connection to the waste water discharge.
Caution
If the condensation drain is not fitted to the waste water discharge using an open
connection, this can cause faults.
7.4.2
Vented water connections
Warning
The installation should be carried out by a competent person, in compliance with general
and locally applicable regulations.
7.4.2.1
Cold water side
See (A) in the installation diagram (see section 7.3).
Fit an approved stop valve (4) on the cold water side between the cold water head
tank (18) and the water heater, as required by applicable regulations.
7.4.2.2
Hot water side
See (B) in the installation diagram (see section 7.3).
Note
Insulating long hot water pipes prevents unnecessary energy loss.
Fit the T&P valve (3).
Optional: fit a temperature gauge (12) so you can check the temperature of the tap
water.
Fit a stop valve (4) in the hot water outlet pipe for servicing.
If a circulation pipe is required, continue by installing the circulation pipe (see section
7.4.1.3).
7.4.2.3
Circulation pipe
See (C) in the installation diagram (see section 7.3).
If an immediate flow of hot water is required at draw-off points, a circulation pump can be
installed. This improves comfort, and reduces water wastage.
Fit a circulation pump (6) of the correct capacity for the length and resistance of the
circulation system.
Fit a non-return valve (5) after the circulation pump to guarantee the direction of
circulation.
Fit two stop valves for servicing (4).
Connect the circulation pipe according to the installation diagram (see section 7.3).
7.4.2.4
Condensation drain
Fit a sloping waste water pipe to the condens trap (13) for condensation drainage
and connect this via an open connection to the waste water discharge.
Caution
If the condensation drain is not fitted to the waste water discharge using an open
connection, this can cause faults.
1.
c
w
1.
n
1.
2.
3.
4.
1.
2.
3.
4.
1.
c
0311704_BFC_28-120_III_
ENEN_V2.4, 2022-10-17
57
Содержание BFC Cyclone 28
Страница 6: ...6...
Страница 13: ...User part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 13...
Страница 14: ...14...
Страница 16: ...16 User part...
Страница 18: ...18 User part...
Страница 24: ...24 User part...
Страница 41: ...Installation Maintenance and Service part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 41...
Страница 42: ...42 User part...
Страница 46: ...46 Installation Maintenance and Service part...
Страница 52: ...52 Installation Maintenance and Service part...
Страница 59: ...Fig Venting systems 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 59...
Страница 76: ...76 Installation Maintenance and Service part...
Страница 78: ...78 Installation Maintenance and Service part...
Страница 84: ...84 Installation Maintenance and Service part...
Страница 102: ...Fig Dimensions BFC 28 30 50 60 102 Installation Maintenance and Service part...
Страница 104: ...Fig Dimensions BFC 80 100 120 104 Installation Maintenance and Service part...
Страница 112: ...12 7 Declaration of conformity 112 Installation Maintenance and Service part...
Страница 113: ......
Страница 114: ......
Страница 118: ...116 Installation Maintenance and Service part...