Instruction manual ADMR
45
gis
5
Filling
5.1
Filling the appliance
5.1.1
Filling unvented installations
Installation diagram
To fill the appliance, proceed as follows:
1. Open the stop valve (11) in the hot water pipe and, if present, the stop valves
(4) for the circulation pump (6).
2. Close the drain valve (9).
3. Open the nearest hot water draw-off point (14).
4. Open the stop valve (4) on the cold water side (A) so that cold water flows
into the appliance.
5. Completely fill the appliance. When a full water jet flows from the nearest
draw-off point, the appliance is full.
6. Bleed the entire installation of air, for example by opening all draw-off points.
Legend
Only applicable numbers are
mentioned.
1. pressure reducing valve
(mandatory)
3. T&P valve (mandatory)
4. stop valve (recommended)
5. non-return valve (mandatory)
6. circulation pump (optional)
7. top to bottom circulation pump
(optional)
9. drain valve
10. manual gas valve (mandatory)
11. service stop valve (mandatory)
12. temperature gauge
(recommended)
14. hot water draw-off points
15. expansion valve (mandatory)
16. expansion vessel (mandatory)
A. cold water supply
B. hot water supply
C. circulation pipe
D. gas supply
C
4
5
6
4
14
14
14
10
D
B
A
4
5 1
15
16
4
5
7
4
9
11
12
3
IMD-0142 R2
Содержание ADMR-40
Страница 4: ...4 Instruction manual ADMR gis...
Страница 8: ...Table of contents 8 Instruction manual ADMR...
Страница 12: ...Introduction 12 Instruction manual ADMR 1 gis...
Страница 38: ...Installation 38 Instruction manual ADMR 3 is...
Страница 56: ...Shutting down 56 Instruction manual ADMR 10 gis...
Страница 64: ...Main menu 64 Instruction manual ADMR 11 gis...
Страница 78: ...is Instruction manual ADMR 78...
Страница 80: ...Maintenance frequency 80 Instruction manual ADMR 14 is...
Страница 86: ...Performing maintenance 86 Instruction manual ADMR 15 s...
Страница 94: ...Appendices 94 Instruction manual ADMR 17 is...
Страница 96: ...Instruction manual ADMR 96...