Filling
44
Instruction manual ADMR
5
gis
5.1.2
Filling vented installations
Installation diagram
To fill the appliance, proceed as follows:
1. Open the stop valve (11) in the hot water pipe and, if present, the stop valves
(4) for the circulation pump (6).
2. Close the drain valve (9).
3. Open the nearest hot water draw-off point (14).
4. Open the stop valve (4) on the cold water side (A) so that cold water flows
into the appliance.
5. Completely fill the appliance. When a full water jet flows from the nearest
draw-off point, the appliance is full.
6. Bleed the entire installation of air, for example by opening all draw-off points.
7. The appliance is now under water supply pressure. There should be no
water coming out of the T&P valve (3). If this does happen, the T&P valve
might be defective or incorrectly fitted.
Legend
Only applicable numbers are
mentioned.
3. T&P valve
4. stop valve (recommended)
5. non-return valve (mandatory)
6. circulation pump (optional)
7. top to bottom circulation pump
(optional)
9. drain valve
10. manual gas valve (mandatory)
11. service stop valve (mandatory)
12. temperature gauge
(recommended)
14. hot water draw-off points
17. 3-way aeration valve
(recommended)
18. water tank
19. float valve
A. cold water supply
B. hot water supply
C. circulation pipe
D. gas supply
E. overflow pipe
H. overflow pipe
10
D
4
5
7
4
3
B
A
4
E
C
14
11
C
4
6
4
5
9
17
4
12
18
19
H
14
14
IMD-0141 R3
Содержание ADMR - 40
Страница 4: ...4 Instruction manual ADMR gis ...
Страница 10: ...Introduction 10 Instruction manual ADMR 1 gis ...
Страница 54: ...Shutting down 54 Instruction manual ADMR 10 gis ...
Страница 62: ...Main menu 62 Instruction manual ADMR 11 gis ...
Страница 76: ...is Instruction manual ADMR 76 ...
Страница 78: ...Maintenance frequency 78 Instruction manual ADMR 14 is ...
Страница 84: ...Performing maintenance 84 Instruction manual ADMR 15 s ...
Страница 92: ...Appendices 92 Instruction manual ADMR 17 is ...
Страница 94: ...Instruction manual ADMR 94 ...